Contractor's Bid for Public Work - City of South Bend
<br />Project No. 115-097
<br />Addendum No. 02
<br />April 20W
<br />70.
<br />Fence, Gate, 4' Height
<br />1
<br />EACH
<br />6,860.00
<br />$6,850.00
<br />71.
<br />Fence, Gate, 6' Height
<br />1
<br />EACH
<br />10,100.00
<br />$10,100,00
<br />72.
<br />Trash Receptacle
<br />1
<br />EACH
<br />2,280.08
<br />$2,280.08
<br />73.
<br />Bike Hitch
<br />10
<br />EACH
<br />364.68
<br />$3,645.80
<br />74.
<br />Bench
<br />2
<br />EACH
<br />3,029.58
<br />$6,059.16
<br />75.
<br />Concrete Planter
<br />10
<br />EACH
<br />664.54
<br />$6,645.40
<br />76.
<br />Delineator Posts, Furnish
<br />25
<br />EACH
<br />33.50
<br />$837.50
<br />77.
<br />Delineator Posts, Furnish and Install
<br />27
<br />EACH
<br />196.00
<br />$5,292.00
<br />78.
<br />Storm Sewer Pipe, 12"
<br />2,159
<br />LFT
<br />40.00
<br />$86,360.00
<br />79.
<br />Storm Sewer Pipe, 12" Water Main Grade Pipe
<br />147
<br />LFT
<br />52.00
<br />$7,644,00
<br />80.
<br />Storm Sewer Pipe, 12" Perforated Pipe
<br />1,069
<br />LFT
<br />45.00
<br />$48,105.00
<br />81.
<br />Standard Inlet, 30"
<br />22
<br />EACH
<br />2,400.00
<br />$52,800.00
<br />82.
<br />Standard Manhole
<br />7
<br />EACH
<br />3,000.00
<br />$21,000,00
<br />83.
<br />Water Main, DIP, 6"
<br />190
<br />LFT
<br />54.00
<br />$10,260.00
<br />84.
<br />Water Main, DIP, 12"
<br />1,475
<br />LFT
<br />70.00
<br />$103,250.00
<br />85.
<br />Water Main, DIP, 16"
<br />65
<br />LFT
<br />137.00
<br />$8,905.00
<br />86.
<br />Water Main, DIP, 24"
<br />30
<br />LFT
<br />350.00
<br />$10,500.00
<br />87.
<br />Gate Valve, 6"
<br />3
<br />EACH
<br />1,250.00
<br />$3,750.00
<br />88.
<br />Gate Valve, 12"
<br />4
<br />EACH
<br />5,000.00
<br />$20,000.00
<br />89.
<br />Butterfly Valve, 16"
<br />1
<br />EACH
<br />4,500.00
<br />$4,500.00
<br />90.
<br />Butterfly Valve, 24"
<br />1
<br />EACH
<br />7,900.00
<br />$7,900.00
<br />91.
<br />Inserta Valve, 12"
<br />4
<br />EACH J
<br />11,000.00
<br />$44,000.00
<br />92.
<br />Line Stop, 16"
<br />1
<br />EACH
<br />13,000,00
<br />$13,000.00
<br />93.
<br />Line Stop, 24"
<br />1
<br />EACH
<br />18,000.00
<br />$18,000.00
<br />94.
<br />6" Bend, 45 Degree
<br />4
<br />EACH
<br />975.00
<br />$3,900.00
<br />95.
<br />12" Bend, 45 Degree
<br />4
<br />EACH
<br />3,500.00
<br />$14,000.00
<br />96,
<br />16" Bend, 45 Degree
<br />2
<br />EACH
<br />3,385.00
<br />$6,770.00
<br />97.
<br />24" Bend, 45 Degree
<br />2
<br />EACH
<br />4,500.00
<br />$9,000.00
<br />98.
<br />Cross, 12" x12"
<br />2
<br />EACH
<br />2,500.00
<br />$5,000.00
<br />99,
<br />Reducer, 6" x 12"
<br />1
<br />EACH
<br />1,300.00
<br />$1,300.00
<br />100.
<br />Reducer, 12" x 16"
<br />1
<br />EACH
<br />3,100.00
<br />$3,100.00
<br />101.
<br />Reducer 12" x 24"
<br />1
<br />EACH
<br />4,000.00
<br />$4,000,00
<br />102.
<br />Plug, 6"
<br />1
<br />EACH
<br />900.00
<br />$900.00
<br />103.
<br />Plug, 12"
<br />1
<br />EACH
<br />1,200,00
<br />$1,200.00
<br />104.
<br />Water Service, 1" Type K Copper, Open Cut
<br />790
<br />LFT
<br />40.00
<br />$31,600.00
<br />105,
<br />Water Service, 1" Type K Copper, Drilled
<br />280
<br />LFT
<br />51.00
<br />$14,280.00
<br />106.
<br />Curb Stop, V
<br />34
<br />EACH
<br />850.00
<br />$28,900.00
<br />107.
<br />Fire Hydrant Assembly
<br />2
<br />EACH
<br />6,200.00
<br />$12,400.00
<br />108.
<br />Adjust Casting to Grade
<br />20
<br />EACH
<br />500.00
<br />$10,000.00
<br />109.
<br />Construction Sign, Wayfinding Signs
<br />52.5
<br />SFT
<br />8,00
<br />$420.00
<br />110.
<br />Maintaining Traffic
<br />1
<br />LS
<br />25,000.00
<br />$25,000.00
<br />Bidder's Name:
<br />Version 7-31/2015 Contractor's Bid For Public Works-9
<br />
|