My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental No. 1 to PSA - DLZ Indiana LLC - Bendix Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental No. 1 to PSA - DLZ Indiana LLC - Bendix Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:45:09 PM
Creation date
4/13/2017 10:12:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUPPLEMENTAL AGREEMENT NO. 1 <br />This Supplemental Agreement No. 1 is made and entered into this bday of <br />� 1, 20AI <br />by and between the City of South Bend, Indiana, acting by and through the Board of Public Works, <br />hereinafter referred to asthe "LPA", and DLZ Indiana, LLC, 2211 East Jefferson Blvd., South Bend, IN 46615, <br />hereinafter referred to as the "CONSULTANT". <br />WITNESSETH <br />WHEREAS, the LPA and CONSULTANT did, on February 10, 2015 enter into an agreement for the <br />preparation of construction documents for the construction of the Road Reconstruction on Bend ix Drive. <br />WHEREAS, during the course of design, certain additional services not included in the original <br />contract dated February 10, 2015, have become necessary; specifically: <br />• Convert plans from an overlay to "Complete Streets" 3-lane redesign. <br />• Additional roadway design for lane transitions and the Nimtr Parkway jughandle <br />design. <br />• Change the design to full depth pavement, <br />• Redesign of the Stage 2 Plans (Rework), <br />• Addition of an & foot sidewalk, <br />• Additional storm sewer assessment and replacement, <br />• Additional Inlet Design, <br />• Addition of traffic signal modifications, <br />• Develop impacts and project costs for multiple conceptual lane configurations, <br />• Evaluate impacts and project costs for adding sidewalks along Bendix while maintaining <br />a 4 lane typical section and a 3 lane typical section, <br />• Perform additional pavement design iterations, <br />• Develop a Traffic Study, <br />• Perform a Traffic Warrant Analysis at two intersections, if required, <br />• Provide plan modifications for alternate bid pavement, <br />• Develop Landscape Design and Plans, <br />• Perform Right of Way Engineering Services. <br />NOW THEREFORE, the LPA and the CONSULTANT desire to amend the above referenced Design <br />Contract as follows: <br />Delete Section IV Compensation of the LPA-Consulting Contract and replace with the following: <br />SECTION 1V COMPENSATION. The LPA shall pay the CONSULTANT for the Services performed <br />under this Contract as set forth in Appendix "D" which is herein attached to and made an <br />integral part of this Contract. The maximum amount payable under this Contract shall not <br />exceed $503,000.00. <br />Delete Line 10 of Section V1.23. of the LPA-Consulting Contract and replace with the following: <br />Eric Horvath, P.E. <br />1of13 <br />Supplemental Agreement No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.