The construction administration services will include: <br />1. Reviews of site construction, when requested by the City, will be completed to ensure the <br />Contractor(s) is providing the level of quality that is required for the project; <br />2. The Engineer will provide clarification/interpretations of the Contract Documents if such <br />interpretations are necessary for the proper execution or progress of work; <br />3. The Engineer shall render written recommendations on claims, disputes and other matters in <br />question between the owner and contractor relating to the execution or progress of the <br />project as provided by the Contract Documents; <br />4. Review and approve, or take other appropriate action and forward to the client for final <br />disposition, the contractor's submittals such as Shop Drawings, Product Data and Samples <br />with respect to Contract Documents produced by the Engieer; <br />5. Prepare responses to Request for Information (RFI) provided by the contractor; <br />6. Provide field reports describing observations, problems and recommended solutions; <br />7. Provide punch lists and based on site observations; <br />8. Conduct a Final Punch List site review; <br />9. Conduct inspections to determine the date or dates of Substantial Completion and the date <br />of Final Completion; <br />10. It is understood that the sculpture, lighting and possibly the fountain are to be installed by <br />June 21, 2017. If not possible due to construction timing, the proposed planting pots, <br />landscaping, and site furniture are to be installed and provided shortly thereafter. <br />11. Review and approve, or take other appropriate action on, the contractor's list of items to be <br />completed or corrected. <br />A 1.03 Michigan Street Improvements <br />The City of South Bend is in the planning stage to to repave the drive lanes on Michigan Street from Colfax <br />Avenue to Western Avenue. As part of this planning effort it has been discussed if the existing 90-degree <br />parking spaces should remain or whether they should be reconfigured as angle parking. The City is also <br />interested is whether adding parking spaces on the east side of Michigan Street between Colfax Avenue an <br />Washington Street is feasible. <br />A. Topographic Survey Activities <br />The Engineer has reviewed the proposed concept drawing, aerial photographs as well as driven the <br />site limits, shown in Attachment B, to obtain a thorough understanding of the task at hand. The <br />survey limits for the Michigan Street Corridor are as follows: Western Avenue intersection is the <br />southern limit and the northern limit is where Michigan Street intersects St. Joseph Street. <br />Topographic information will be collected within the right-of-way of Michigan Street. A total <br />.................. <br />Page 10 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCAC. All rights reserved. <br />