My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - 2017 Street and Sewer Department Materials - Various
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Award Bids
>
Award Bid - 2017 Street and Sewer Department Materials - Various
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 11:52:26 AM
Creation date
4/13/2017 8:49:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID NAME <br />FOR BIDS DUE <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2017 Street Materials <br />March 28, 2017, 9.30 a.m., Local Time <br />Item <br />No. <br />Description <br />Est. Qty. <br />Unit <br />Unit Price <br />Total <br />PART A — ASPHALT MATERIALS <br />A-1 <br />HMA Surface 11 L <br />7,500 <br />TON <br />$ <br />A-3 <br />HMA Surface 11 L MAC HD <br />3,500 <br />TON <br />$ <br />A-4 <br />HMA Surface 11S <br />1,000 <br />TON <br />$ <br />A-6 <br />HMA Binder 819 <br />1,000 <br />TON <br />$ <br />A-7 <br />HMA Binder 11 <br />3,500 <br />TON <br />$ <br />A-8 <br />HMA Binder 11 MAC <br />3,000 <br />TON <br />$ <br />A-9 <br />HMA Base 5D <br />1,000 <br />TON <br />$ <br />A-10 <br />AE-T Tack <br />30,000 <br />GAL <br />$ <br />A-11 <br />RS-2 <br />30,000 <br />GAL <br />$ <br />A-13 <br />MAC 20 Crack Seal <br />2.500 <br />GAL <br />$ <br />A-14 <br />CMA Patch AE-300 HP <br />600 <br />TON <br />$ <br />Part A Total <br />$ <br />PART B — PCC MATERIALS <br />B-1 <br />Class A Concrete <br />1,800 <br />CY <br />$ <br />B-2 <br />Class A High Early <br />600 <br />CY <br />$ <br />B-3 <br />High Early Concrete wlintegral Color- <br />Black <br />150 <br />CY <br />$ <br />B-4 <br />Flowable Fill, Removable <br />300 <br />CY <br />$ <br />B-9 <br />Non -Chloride Accelerator added to <br />concrete -- 0.5% <br />250 <br />EACH CY <br />$ <br />B-10 <br />Non-ChlorideAcceleratoradded to <br />concrete — 1 /o <br />750 <br />EACH CY <br />$ <br />B 11 <br />Non -Chloride Accelerator added to <br />concrete -- 2 /a <br />500 <br />EACH CY <br />L <br />Part B Total <br />$ <br />PART C — AGGREGATE MATERIALS <br />C-1 <br />No. 23 Sand <br />5,000 <br />TON <br />$ <br />C-2 <br />No. 53 Gravel <br />1.000 <br />TON <br />$ <br />C-3 <br />No. 53 Recycled Concrete <br />4,000 <br />TON <br />$ <br />C-4 <br />No. 53 Slag <br />1,000 <br />TON <br />$ <br />C-5 <br />Topsoil <br />100 <br />CY <br />$ <br />C-7 <br />No. 11 Slag Chip Stone <br />800 <br />TON <br />$ <br />Part C Total <br />$ <br />j <br />Bidder Name:'lLGtdj(,� <br />Ver. 13 -- 6101115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.