REGULAR MEETING MARCH 14, 2017 65 <br />gas in lieu of diesel fuel. Unit to be <br />ea. <br />I <br />complete with all necessary components <br />installed at time of chassis manufacture, no <br />retrofits accepted <br />2 <br />Engine and electronics extended 5 year, <br />$3,000 <br />$3,000 each <br />100.000 mile warranty —PLAN I <br />each <br />3 <br />Five (5) Year unlimited mileage <br />$1,001 <br />$1,001 each <br />transmission warranty <br />each <br />Estimated number of days for delivery from award date — 120-130 Days <br />Option No.2 <br />Description <br />I Year/Make/Model <br />I Unit Price <br />28 YD ASL MACK <br />CNG <br />2016 MACK LEU633 RH STAND CNII <br />1SLG <br />1 $303,740.00 <br />12011 1 SW584Freiehtliner25Yard Packer 1 $5.000 <br />Alternate <br />Description <br />Cost <br />Total <br />No. <br />1 <br />Unit to be fueled by compressed natural ''. <br />Above <br />Above Pricing <br />gas in lieu of diesel fuel. Unit to be ! <br />Pricing <br />Includes CNG <br />complete with all necessary components <br />Includes <br />System <br />installed at time of chassis manufacture. no <br />CNG <br />retrofits accepted <br />Svstem <br />2 <br />Engine and electronics extended 5 year, <br />' $3,000 <br />$3,000 each <br />100,000 mile warranty — PLAN 1 <br />each <br />3 <br />Five (5) Year unlimited mileage <br />$1,001 <br />$1,001 each <br />transmission warranty <br />each <br />Estimated number of days for delivery from award date — 60-75 Days <br />Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above bids were <br />referred to Solid Waste and Central Services for review and recommendation. <br />AWARD QUOTATION — WATER WORKS LARGE METER TESTING (WATER WORKS <br />OPERATIONS) <br />Mr. Ed Herman, Water Works, advised the Board that on Februay 28, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Herman recommended that the Board award the contract to the sole responsive and responsible <br />bidder, M.E. Simpson Co., Inc., 3406 Enterprise Ave., Valparaiso, IN 46383, in unit prices, not <br />to exceed the amount of $57,275. In a memo to the Board, Mr. Herman noted that M.E. Simpson <br />made a math error in the multiplication of Line Item No. 3 of their quote which resulted in a <br />difference in their total of $1,700. Their submitted total showed $55,575. but the correct amount <br />was $57,275. Mr. Herman stated in his memo that he contacted them and they confirmed their <br />error and the correct total. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. Doran seconded the motion. <br />which carried. <br />APPROVE PROJECT COMPLETION AFFIDAVIT IGNITION PARK <br />INFRASTRUCTURE, PHASE 1 C - PROJECT NO. 114-063A (RWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, for the <br />above referenced project, indicating a final cost of $4,277,077.38. upon a motion made by Ms. <br />Maradik, seconded by Ms. Dorau and carried, the Project Completion Affidavit was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — THREE (3). <br />MORE OR LESS, 2017 OR NEWER, FOUR DOOR HYBRID UTILITY VEHICLES — SPEC F <br />(BUILDING DEPARTMENT CAPITAL LEASE) <br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to <br />advertise for the receipt of bids for the above referenced vehicles. Therefore, upon a motion <br />made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was approved. <br />