REGULAR MEETING FEBRUARY 14, 2017 30 <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: $157,917.84 <br />*Option with Xeon Processor instead of i7: 551,792.00 <br />Attorney Schmidt noted Y&S submitted two (2) bids, one for the standard fourteen (14) items <br />and one with an additional item. Upon a motion made by Ms. Maradik, seconded by Mr. Mueller <br />and carried, the above bids were referred to Community Investment, Engineering, and Legal for <br />review and recommendation. <br />OPENING AND AWARD OF BIDS — 2017 TRUCKING OF BELT -PRESSED BIOSOLIDS <br />,FOR LAND APPLICATION (ORGANIC RESOURCES CONTRACTUAL SERVICE <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication. of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bid was opened and publicly <br />read: <br />TRUCKS R US, INC. <br />23942 State Road 2 <br />South Bend, IN 46619 <br />Bid was signed by: James Burger <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit; Certification Regarding <br />Investment with Iran, Employrnem Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: $95.00 per truck/per hour <br />-- Upon a motion made by Ms. Maradik, seconded by Mr. Mueller and carried, the above bid was <br />referred to Wastewater for review, and recommendation. After reviewing the bid, Mr. Jacob <br />Klosinski, Wastewater, recommended that the Board award the contract to the sole low <br />responsive and responsible bidder, Trucks'R Us, Inc., in the amount of $95 per hour, per truck. <br />He noted Trucks'R Us included a 10% bid bond, but the specs called for a bid bond in the <br />amount of $5,000. He stated 10% of their total bid would be more than $5,000, so that was <br />acceptable. 'Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />bid be awarded and the contract approved as outlined above. Mr. Mueller seconded the motion, <br />which carried. <br />AWARD BID — FIVE -THOUSAND (5 000) MORE OR LESS UNIVERSAL NESTABLE <br />REFUSE CONTAINERS - SPEC A (2017 SOLID WASTE CAPFTAL LEASE PRINCIPAL & <br />INTERESTI <br />Mr. Matt Chlebowski, Central Services, advised the Board that on January 10, 2017, bids were <br />received and opened for the above referenced equipment. After reviewing those bids, Mr. <br />Chlebowski recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Pyramid Equipment, Inc., 211 S Prairie, Rolling Prairie, IN 46371, in unit <br />prices not to exceed the amount of $243,625. Therefore; Ms. Maradik made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Mueller seconded <br />the motion, which carried. <br />Mr. Matt Chlebowski, Central Services,advised the Board that on January 10, 2017, bids were <br />received and opened for the above referenced equipment. After reviewing those bids, Mr. <br />Chlebowski recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Pyramid Equipment, Inc., 211 S Prairie, Rolling Prairie, IN 46371, in the <br />amount of $190,402. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the bid be awarded as outlined above. Mr. Mueller seconded the motion, which <br />carried. <br />