Laserfiche WebLink
Contract Documents. Such reviews and approvals or other action will not extend to means, <br />methods, techniques, sequences, or procedures of construction or to safety precautions and <br />programs incident thereto. Engineer shall meet any Contractor's submittal schedule that <br />Engineer has accepted. <br />12. Substitutes and "or -equal" Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: DELETED <br />14. Disagreements between Owner and Contractor: DELETED <br />15. Applications for Payment: DELETED <br />16. Contractor's Completion Documents: DELETED <br />17. Substantial Completion: DELETED <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: <br />a. The Engineer will provide design support to the Owner's Resident Project Engineer, <br />as required and as directed by the Owner. The Engineer will meet at the project site <br />with the Owner or their Resident Project Engineer, as directed by the Owner, to assist <br />in any matter that may arise during the construction of the project. <br />19. Final Notice ofAcceptability of the Work. DELETED <br />A. Duration of Construction Phase: DELETED <br />B. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />D 1.02 Post -Construction Phase DELETED <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />A. If authorized in writing by the Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed in the following paragraphs. These services are not included as part of <br />the basic services of the Engineer except to the extent provided otherwise in Appendix "A". These <br />Page 12 <br />(Exhibit A— Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />