My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:25:23 AM
Creation date
3/2/2017 1:36:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Consult with Owner as to the acceptability of subcontractors, suppliers, and other individuals <br />and entities proposed by prospective contractors for those portions of the Work as to which <br />such acceptability is required by the bidding documents. <br />5. If bidding documents require, the Engineer shall evaluate and determine the acceptability of <br />"or equals" and substitute materials and equipment proposed by bidders, but subject to the <br />provisions of paragraph A2.02.A.2 of this Exhibit A. <br />6. Attend the Bid opening, prepare Bid tabulation sheets, and submit to the Owner. <br />7Perform or provide the following additional Biddingor TTegati..ting Phase tasks <br />B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors. <br />A1.06 Construction Phase <br />A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />1. General Administration of Construction Contract: DELETED <br />2. Resident Project Representative (RPR): DELETED <br />3. Selecting Independent Testing Laboratory: Assist Owner in the selection of an independent <br />testing laboratory to perform the services identified in Exhibit B, Paragraph B2.01.0. <br />DELETED <br />4. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: DELETED <br />6. Baselines and Benchmarks: DELETED <br />7. Visits to Site and Observation of Construction: DELETED <br />8. Defective Work: DELETED <br />9. Clarifications and Interpretations; Field Orders: DELETED <br />10. Change Orders and Work Change Directives: DELETED <br />11. Shop Drawings and Samples., Review and approve or take other appropriate action in respect <br />to Shop Drawings and Samples and other data which Contractor is required to submit, but only <br />for conformance with the information given in the Contract Documents and compatibility with <br />the design concept of the completed Project as a functioning whole as indicated by the <br />Page 11 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.