Laserfiche WebLink
2) The Engineer shall perform lighting photometric calculations using Visual software. <br />Illumination levels shall meet Owner's standards or in the absence of such standards, <br />Illuminating Engineering Society of North America (IES) standards. <br />3) The Engineer shall coordinate with the utility company and identify service point <br />locations and perform voltage drop calculations. <br />4) The Engineer shall prepare quantities, cost estimate, and special provisions. <br />5) Ornamental Light poles may be utilized. The Owner shall provide pole and fixture <br />specification to be used for the project. <br />6) If ornamental light poles are utilized, foundation design will be performed in <br />accordance with manufacturer's recommendations. <br />d. Traffic Signal Modification Design, if Required <br />1) The Engineer shall design a traffic signal modification, or new traffic signal installation <br />or the installation of stop signs, as required, at the intersection of Colfax Avenue with <br />LaPorte Avenue using Owner's standards. Specifications for use in bidding and an <br />opinion of probable construction cost shall be prepared. It is assumed that no lane <br />additions or roadway widening will be required to accommodate two-way traffic or <br />turn lanes. <br />3. Intersection Improvement of Colfax Avenue and Studebaker Street including (See Exhibit <br />A.2.): <br />a. Develop Design and Plans for removal of guardrail on the south side of Colfax Avenue <br />with Studebaker Street intersection. <br />b. Design roadway removal and restoration work of Colfax Avenue from Birdsell Street to <br />Studebaker Street. <br />1) Develop a preliminary horizontal alignment through the project limits, <br />2) Develop a cover sheet and typical section, <br />3) Develop preliminary design and plans including: <br />i) Curb ramps for (2) quadrants on the south side of the intersection of Colfax Avenue <br />with Studebaker Street. The Engineer shall develop geometries for all curb ramps <br />ii) Develop plans for new curb and sidewalk along the east side of Birdsell Street and <br />along the south side of Orange Street <br />iii) Develop plans to extend existing asphalt alley from Colfax Avenue to merge with <br />Orange Street <br />4) Develop preliminary specifications, <br />5) Quantity calculations and opinion of probable construction costs. <br />c. Prepare exhibits for street vacation as required by Owner on W. Colfax Avenue from <br />Birdsell Street to the North -South Alley east of Birdsell Street. <br />4. The Engineer shall engage a Subconsultant to develop Landscape Design and Plans for the <br />City of South Bend Cemetery Gathering Plaza (See Exhibit A.4.) located along Elm Street, <br />from Colfax Avenue to the entrance of the City Cemetery, and extending east along the north <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />