My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:25:23 AM
Creation date
3/2/2017 1:36:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
together with such other Project -related costs that Owner furnishes for inclusion, <br />including but not limited to cost of land, rights -of -way, compensation for damages to <br />properties, Owner's costs for legal, accounting, insurance counseling and auditing <br />services, interest and financing charges incurred in connection with the Project, and the <br />cost of other services to be provided by others to Owner pursuant to Exhibit B of this <br />Agreement. <br />33. Work — The entire construction or the various separately identifiable parts thereof required <br />to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment into <br />such construction, all as required by the Contract Documents. <br />ARTICLE 8 — EXHIBITS AND SPECIAL PROVISIONS <br />8.01 Exhibits Included: <br />A. Exhibit A, Engineer's Services. <br />A.I. Appendix 1 of Exhibit A, Survey Limits for Colfax Avenue with Elm Street and W. Lasalle <br />Avenue <br />A.2. Appendix 2 of Exhibit A, Survey Limits for W. Colfax Avenue with Studebaker Street <br />A.3. Appendix 3 of Exhibit A, Lighting Design <br />A.4. Appendix 4 of Exhibit A, Landscape Design <br />A.5. Appendix 5 of Exhibit A, R.O.W. Acquisition <br />B. Exhibit B, Owner's Responsibilities. <br />C. Exhibit C, Payments to Engineer for Services and Reimbursable Expenses. <br />C. 1. Appendix 1 of Exhibit C, Standard Hourly Rates <br />D. Exhibit D, Duties, Responsibilities and himitations of Authority of Resident Prejee <br />Representative: NOT INCLUDED <br />E. Exhibit E Netiee of A ,...ept abilifY ofWork. NOT INCLUDED <br />F. Exhibit >r Construction Cost r ;.....;. NOT INCLUDED <br />x . Exhibit r , ccacoccacuaac cv.rzzm'rir, <br />G. Exhibit G, Insurance. <br />II Exhibit 14,,;,.. ete Reseltitien. NOT INCLUDED <br />1. Exhibit 1, Limitations of Liability. <br />1 Exhibit j, SpecialProvisions. NOT INCLUDED <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.