My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:25:23 AM
Creation date
3/2/2017 1:36:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22. Record Drawings — Drawings depicting the completed Project, prepared by Engineer as <br />an Additional Service and based solely on Contractor's record copy of all Drawings, <br />Specifications, addenda, change orders, work change directives, field orders, and written <br />interpretations and clarifications, as delivered to Engineer and annotated by Contractor to <br />show changes made during construction. <br />23. Reimbursable Expenses — The expenses incurred directly by Engineer in connection with <br />the performing or furnishing of Basic and Additional Services for the Project. <br />24. Resident Project Representative — The authorized representative of Engineer assigned to <br />assist Engineer at the Site during the Construction Phase. As used herein, the term <br />Resident Project Representative or "RPR" includes any assistants or field staff of Resident <br />Project Representative agreed to by Owner. The duties and responsibilities of the <br />Resident Project Representative, if any, are as set forth in Exhibit D. <br />25. Samples — Physical examples of materials, equipment, or workmanship that are <br />representative of some portion of the Work and which establish the standards by which <br />such portion of the Work will be judged. <br />26. Shop Drawings — All drawings, diagrams, illustrations, schedules, and other data or <br />information which are specifically prepared or assembled by or for Contractor and <br />submitted by Contractor to illustrate some portion of the Work. <br />27. Site — Lands or areas to be indicated in the Contract Documents as being famished by <br />Owner upon which the Work is to be performed, including rights -of -way and easements <br />for access thereto, and such other lands furnished by Owner which are designated for the <br />use of Contractor. <br />28. Specifications — That part of the Contract Documents consisting of written technical <br />descriptions of materials, equipment, systems, standards, and workmanship as applied to <br />the Work and certain administrative details applicable thereto. <br />29. Subcontractor — An individual or entity having a direct contract with Contractor or with <br />any other Subcontractor for the performance of a part of the Work at the Site. <br />30. Substantial Completion — The time at which the Work (or a specified part thereof) has <br />progressed to the point where, in the opinion of Engineer, the Work (or a specified part <br />thereof) is sufficiently complete, in accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms "substantially complete" and "substantially completed" as applied to all or part <br />of the Work refer to Substantial Completion thereof. <br />31. Supplier — A manufacturer, fabricator, supplier, distributor, materialman, or vendor <br />having a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32. Total Project Costs — The sum of the Construction Cost, allowances for contingencies, <br />and the total costs of services of Engineer or other design professionals and consultants, <br />Page 15 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National SDdetY of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.