Laserfiche WebLink
No. <br />Line Item <br />Removal from Contract <br />City <br />Unit Price <br />Total <br />23 <br />MILLING, ASPHALT, 2.51N <br />774 <br />$4.00 <br />$3,096.00 <br />24 <br />HMA SURFACE, TYPE B <br />65 <br />$67.00 <br />$4,355.00 <br />27 <br />HMA WEDGE & LEVEL, TYPE B <br />2 <br />$75.00 <br />$150.00 <br />32 <br />SIDEWALK, CONCRETE, 41N. <br />140 <br />$30.00 <br />$4,200.00 <br />34 <br />CURB, MODIFIED, CONCRETE <br />250 <br />$24.00 <br />$6,000.00 <br />35 <br />PCCP FOR APPROACHES, 61N. <br />10 <br />$45.00 <br />$450.00 <br />1.04 <br />ALTA: CURB, CONCRETE, REMOVE <br />1860 <br />$2.00 <br />$3,720.00 <br />1.05 <br />ALT A: CONCRETE, REMOVE <br />160 <br />$4.00 <br />$640,00 <br />1.06 <br />ALTA: PAVEMENT REMOVAL <br />750 <br />$6.00 <br />$4,500.00 <br />1.09 <br />ALTA: COMMON EXCAVATION <br />240 <br />$22.00 <br />$5,280.00 <br />1A <br />ALTA: B-BORROW <br />160 <br />$7.50 <br />$1,200.00 <br />1.13 <br />ALT A: COMPACTED AGGREGATE, NO. 53, BASE <br />185 <br />$23.00 <br />$4,255.00 <br />1.14 <br />ALT A: MILLING, ASPHALT, 2.51N <br />6040 <br />$2.00 <br />$12,080.00 <br />1.15 <br />ALT A: HMA SURFACE, TYPE B <br />500 <br />$65.00 <br />$32,500.00 <br />L16 <br />ALT A: HMA INTERMEDIATE, TYPE B <br />45 <br />$50.00 <br />$2,250.00 <br />1.17 <br />ALT A: HMA BASE, TYPE B <br />90 <br />$47.00 <br />$4,230.00 <br />1.19 <br />ALT A: HMA WEDGE AND LEVEL, TYPE B <br />336 <br />$60.00 <br />$20,160.00 <br />1.2 <br />ALT A: ASPHALT FOR TACK COAT <br />1 <br />$15.001 <br />$15.00 <br />1.22 <br />ALT A: SIDEWALK, CONCRETE, 4 IN. <br />80 <br />$30.00 <br />$2,400.00 <br />1.24 <br />ALTA: CURB, MODIFIED, CONCRETE <br />1720 <br />$21.00 <br />$36,120.00 <br />1.25 <br />ALTA: PCCP FORAPPROACHES, S IN. <br />305 <br />$55.00 <br />$16,775.00 <br />1.26 <br />ALTA: SODDING <br />840 <br />$4.52 <br />$3,796.80 <br />1.28 <br />ALTA: ADJUSTCASTINGTO GRADE <br />4 <br />$350.00 <br />$1,400.00 <br />1.29 <br />ALTA: ADJUSTVALVE BOXTO GRADE <br />3 <br />$35.00 <br />$105,00 <br />1.38 <br />ALTA: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE <br />198 <br />$9.72 <br />$1,924.56 <br />1.39 <br />ALTA: SIGN, SHEET, WITH LEGEND0.080" <br />111 <br />$16.75 <br />$1,859.25 <br />1.4 <br />ALTA: SIGN AND POST, REMOVE AND RESET <br />1 <br />1 $150.00 <br />$150.00 <br />1.41 <br />ALTA:LINE, THERMOPLASTIC, SOLID, WHITE, 41N. <br />878 <br />$1.50 <br />$1,317.00 <br />1.42 <br />ALTA:TRANSVERSE PAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N. <br />675 <br />$2.25 <br />$1,518.75 <br />1.43 <br />ALTA:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N. <br />90 <br />$7.00 <br />$630.00 <br />1.44 <br />ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, SHARED LANE <br />8 <br />$375.00 <br />$3,000.00 <br />1.45 <br />ALTA:LINE,THERMOPLASTIC, BROKEN, YELLOW, 41N. <br />335 <br />$1.50 <br />$502.50 <br />1.46 <br />ALTA: PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION ARROW <br />9 <br />$125.00 <br />$1,125.00 <br />1.47 <br />ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, ONLY <br />7 <br />$150.00 <br />$1,050.00 <br />1.48 <br />ALT A:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. <br />2085 <br />$1.50 <br />$3,127.50 <br />2.02 <br />ALT B: MOBILIZATION AND DEMOBILIZATION <br />1 <br />$6,500.00 <br />$6,500.00 <br />2.05 <br />ALT B: CURB, CONCRETE, REMOVE <br />1000 <br />1 $2.00 <br />$2,000.00 <br />2.06 <br />ALT B: CONCRETE, REMOVE <br />1360 - <br />$4.00 <br />$5,440.00 <br />2.07 <br />ALT B: PAVEMENT REMOVAL <br />175 <br />$6.00 <br />$1,050.00 <br />2.09 <br />ALT B: B BORROW <br />230 <br />$750 <br />$1,725.00 <br />2.1 <br />ALT B: TEMPORARY EROSION AND SEDIMENT CONTROL <br />1 <br />$4,500.00 <br />$4,500.00 <br />2.11 <br />ALT B: FLOWABLE BACKFILL, NON -REMOVABLE <br />2 <br />$250.00 <br />$500.00 <br />2.12 <br />ALT B: COMPACTED AGGREGATE, NO.53, BASE <br />30 <br />$20.00 <br />$600.00 <br />2.13 <br />ALT B: MILLING, ASPHALT, 2.5 IN <br />1800 <br />$2.00 <br />$3,600.00 <br />2.14 <br />ALT B: HMA SURFACE, TYPE B <br />150 <br />$68.00 <br />$10,200.00 <br />2.15 <br />ALT B: HMA FOR PATCHING <br />50 <br />$75.00 <br />$3,750.00 <br />2.16 <br />ALT B: HMA WEDGE AND LEVEL, TYPE B <br />100 <br />$65.00 <br />$6,500.00 <br />2.17 <br />ALT B: ASPHALT FOR TACK COAT <br />1 <br />$15.00 <br />$15.00 <br />2.18 <br />ALT B: CURB RAMP, CONCRETE, G <br />10 <br />$145.00 <br />$1,450.00 <br />2.19 <br />ALT B: SIDEWALK, CONCRETE, 41N. <br />920 <br />$30.00 <br />$27,600.00 <br />2.2 <br />ALT B: CURB, MODIFIED, CONCRETE <br />625 <br />$22.00 <br />$13,750.00 <br />2.21 <br />ALT B: PCCP FOR APPROACHES, 61N. <br />35 <br />$50.00 <br />$1,750.00 <br />2.22 <br />ALT B: PCCP FOR APPROACHES, 8 IN. <br />750 <br />$52.00 <br />$39,000.00 <br />2.23 <br />ALT B: SODDING <br />840 <br />$452 <br />$3,796.80 <br />2.25 <br />ALT B: ADJUST CASTING TO GRADE <br />5 <br />$350.00 <br />$1,750.00 <br />2.26 <br />ALT B: ADJUST VALVE BOX TO GRADE <br />10 <br />$35.00 <br />$350.00 <br />2.3 <br />ALT B: MAINTAINING TRAFFIC <br />1 <br />$3,500.00 <br />$3,500.00 <br />2.31 <br />ALT B: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE <br />15 <br />$9.72 <br />$145.80 <br />2.32 <br />ALT B: SIGN, SHEET, WITH LEGEND 0.080" <br />12 <br />$16.75 <br />$201.00 <br />2.33 <br />ALT B: SIGN AND POST, REMOVE <br />2 <br />$85.00 <br />$170.00 <br />2.34 <br />ALT B: SIGN AND POST, REMOVE AND RESET <br />4 <br />$150.00 <br />$600.00 <br />2.35 <br />ALT B: TRANSVERSEPAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N. <br />44 <br />$7.00 <br />$308.00 <br />2.36 <br />ALT B:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N. <br />11 <br />$7.00 <br />$77.00 <br />2.37 <br />JALT B:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N. <br />925 <br />$1.50 <br />$1,387,50 <br />Total= $328,098.46 <br />