No.
<br />Line Item
<br />Removal from Contract
<br />City
<br />Unit Price
<br />Total
<br />23
<br />MILLING, ASPHALT, 2.51N
<br />774
<br />$4.00
<br />$3,096.00
<br />24
<br />HMA SURFACE, TYPE B
<br />65
<br />$67.00
<br />$4,355.00
<br />27
<br />HMA WEDGE & LEVEL, TYPE B
<br />2
<br />$75.00
<br />$150.00
<br />32
<br />SIDEWALK, CONCRETE, 41N.
<br />140
<br />$30.00
<br />$4,200.00
<br />34
<br />CURB, MODIFIED, CONCRETE
<br />250
<br />$24.00
<br />$6,000.00
<br />35
<br />PCCP FOR APPROACHES, 61N.
<br />10
<br />$45.00
<br />$450.00
<br />1.04
<br />ALTA: CURB, CONCRETE, REMOVE
<br />1860
<br />$2.00
<br />$3,720.00
<br />1.05
<br />ALT A: CONCRETE, REMOVE
<br />160
<br />$4.00
<br />$640,00
<br />1.06
<br />ALTA: PAVEMENT REMOVAL
<br />750
<br />$6.00
<br />$4,500.00
<br />1.09
<br />ALTA: COMMON EXCAVATION
<br />240
<br />$22.00
<br />$5,280.00
<br />1A
<br />ALTA: B-BORROW
<br />160
<br />$7.50
<br />$1,200.00
<br />1.13
<br />ALT A: COMPACTED AGGREGATE, NO. 53, BASE
<br />185
<br />$23.00
<br />$4,255.00
<br />1.14
<br />ALT A: MILLING, ASPHALT, 2.51N
<br />6040
<br />$2.00
<br />$12,080.00
<br />1.15
<br />ALT A: HMA SURFACE, TYPE B
<br />500
<br />$65.00
<br />$32,500.00
<br />L16
<br />ALT A: HMA INTERMEDIATE, TYPE B
<br />45
<br />$50.00
<br />$2,250.00
<br />1.17
<br />ALT A: HMA BASE, TYPE B
<br />90
<br />$47.00
<br />$4,230.00
<br />1.19
<br />ALT A: HMA WEDGE AND LEVEL, TYPE B
<br />336
<br />$60.00
<br />$20,160.00
<br />1.2
<br />ALT A: ASPHALT FOR TACK COAT
<br />1
<br />$15.001
<br />$15.00
<br />1.22
<br />ALT A: SIDEWALK, CONCRETE, 4 IN.
<br />80
<br />$30.00
<br />$2,400.00
<br />1.24
<br />ALTA: CURB, MODIFIED, CONCRETE
<br />1720
<br />$21.00
<br />$36,120.00
<br />1.25
<br />ALTA: PCCP FORAPPROACHES, S IN.
<br />305
<br />$55.00
<br />$16,775.00
<br />1.26
<br />ALTA: SODDING
<br />840
<br />$4.52
<br />$3,796.80
<br />1.28
<br />ALTA: ADJUSTCASTINGTO GRADE
<br />4
<br />$350.00
<br />$1,400.00
<br />1.29
<br />ALTA: ADJUSTVALVE BOXTO GRADE
<br />3
<br />$35.00
<br />$105,00
<br />1.38
<br />ALTA: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE
<br />198
<br />$9.72
<br />$1,924.56
<br />1.39
<br />ALTA: SIGN, SHEET, WITH LEGEND0.080"
<br />111
<br />$16.75
<br />$1,859.25
<br />1.4
<br />ALTA: SIGN AND POST, REMOVE AND RESET
<br />1
<br />1 $150.00
<br />$150.00
<br />1.41
<br />ALTA:LINE, THERMOPLASTIC, SOLID, WHITE, 41N.
<br />878
<br />$1.50
<br />$1,317.00
<br />1.42
<br />ALTA:TRANSVERSE PAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N.
<br />675
<br />$2.25
<br />$1,518.75
<br />1.43
<br />ALTA:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N.
<br />90
<br />$7.00
<br />$630.00
<br />1.44
<br />ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, SHARED LANE
<br />8
<br />$375.00
<br />$3,000.00
<br />1.45
<br />ALTA:LINE,THERMOPLASTIC, BROKEN, YELLOW, 41N.
<br />335
<br />$1.50
<br />$502.50
<br />1.46
<br />ALTA: PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION ARROW
<br />9
<br />$125.00
<br />$1,125.00
<br />1.47
<br />ALTA: PAVEMENT MESSAGE MARKING, THERMOPLASTIC, ONLY
<br />7
<br />$150.00
<br />$1,050.00
<br />1.48
<br />ALT A:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N.
<br />2085
<br />$1.50
<br />$3,127.50
<br />2.02
<br />ALT B: MOBILIZATION AND DEMOBILIZATION
<br />1
<br />$6,500.00
<br />$6,500.00
<br />2.05
<br />ALT B: CURB, CONCRETE, REMOVE
<br />1000
<br />1 $2.00
<br />$2,000.00
<br />2.06
<br />ALT B: CONCRETE, REMOVE
<br />1360 -
<br />$4.00
<br />$5,440.00
<br />2.07
<br />ALT B: PAVEMENT REMOVAL
<br />175
<br />$6.00
<br />$1,050.00
<br />2.09
<br />ALT B: B BORROW
<br />230
<br />$750
<br />$1,725.00
<br />2.1
<br />ALT B: TEMPORARY EROSION AND SEDIMENT CONTROL
<br />1
<br />$4,500.00
<br />$4,500.00
<br />2.11
<br />ALT B: FLOWABLE BACKFILL, NON -REMOVABLE
<br />2
<br />$250.00
<br />$500.00
<br />2.12
<br />ALT B: COMPACTED AGGREGATE, NO.53, BASE
<br />30
<br />$20.00
<br />$600.00
<br />2.13
<br />ALT B: MILLING, ASPHALT, 2.5 IN
<br />1800
<br />$2.00
<br />$3,600.00
<br />2.14
<br />ALT B: HMA SURFACE, TYPE B
<br />150
<br />$68.00
<br />$10,200.00
<br />2.15
<br />ALT B: HMA FOR PATCHING
<br />50
<br />$75.00
<br />$3,750.00
<br />2.16
<br />ALT B: HMA WEDGE AND LEVEL, TYPE B
<br />100
<br />$65.00
<br />$6,500.00
<br />2.17
<br />ALT B: ASPHALT FOR TACK COAT
<br />1
<br />$15.00
<br />$15.00
<br />2.18
<br />ALT B: CURB RAMP, CONCRETE, G
<br />10
<br />$145.00
<br />$1,450.00
<br />2.19
<br />ALT B: SIDEWALK, CONCRETE, 41N.
<br />920
<br />$30.00
<br />$27,600.00
<br />2.2
<br />ALT B: CURB, MODIFIED, CONCRETE
<br />625
<br />$22.00
<br />$13,750.00
<br />2.21
<br />ALT B: PCCP FOR APPROACHES, 61N.
<br />35
<br />$50.00
<br />$1,750.00
<br />2.22
<br />ALT B: PCCP FOR APPROACHES, 8 IN.
<br />750
<br />$52.00
<br />$39,000.00
<br />2.23
<br />ALT B: SODDING
<br />840
<br />$452
<br />$3,796.80
<br />2.25
<br />ALT B: ADJUST CASTING TO GRADE
<br />5
<br />$350.00
<br />$1,750.00
<br />2.26
<br />ALT B: ADJUST VALVE BOX TO GRADE
<br />10
<br />$35.00
<br />$350.00
<br />2.3
<br />ALT B: MAINTAINING TRAFFIC
<br />1
<br />$3,500.00
<br />$3,500.00
<br />2.31
<br />ALT B: SIGN POST, SQUARE, TYPE 2, REINFORCED ANCHOR BASE
<br />15
<br />$9.72
<br />$145.80
<br />2.32
<br />ALT B: SIGN, SHEET, WITH LEGEND 0.080"
<br />12
<br />$16.75
<br />$201.00
<br />2.33
<br />ALT B: SIGN AND POST, REMOVE
<br />2
<br />$85.00
<br />$170.00
<br />2.34
<br />ALT B: SIGN AND POST, REMOVE AND RESET
<br />4
<br />$150.00
<br />$600.00
<br />2.35
<br />ALT B: TRANSVERSEPAVEMENT MARKING,THERMOPLASTIC, CROSSWALK LINE, 61N.
<br />44
<br />$7.00
<br />$308.00
<br />2.36
<br />ALT B:TRANSVERSE PAVEMENT MARKING, THERMOPLASTIC, STOP LINE, 241N.
<br />11
<br />$7.00
<br />$77.00
<br />2.37
<br />JALT B:LINE, THERMOPLASTIC, SOLID, YELLOW, 41N.
<br />925
<br />$1.50
<br />$1,387,50
<br />Total= $328,098.46
<br />
|