My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - East Bank Sewer Separation Phase 5 Proj No 114-062B - Walsh & Kelly, Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 6 - East Bank Sewer Separation Phase 5 Proj No 114-062B - Walsh & Kelly, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:56 PM
Creation date
3/2/2017 12:35:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 114-062B <br />Change Order No. 6 - 2/23/17 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: East Bank Sewer Separation - Phase 5 (Division B) <br />Project No. 114-062B <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: February 23, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />QtV Unit <br />1. Line Item Reductions <br />(See attached) <br />2. Add Soil Removal <br />8,300 Tons <br />3. Add Borrow <br />2,561 CYD <br />Price Days Total <br />($328,098.46) <br />$40 0 $332,000.00 <br />$18 0 $46,098.00 <br />Net Change Order amount $49,999.54 <br />[Funding approved from account number: 429.1050.460.42.03 (Project 15J016)] <br />1) Line Item Reductions are being used to reallocate funds to pay for unsuitable soil removals. <br />Originally planned streetscape work along St. Louis Blvd, Jefferson Blvd, and the northernmost <br />portion of St. Peter St are being eliminated so the money can be used for soil disposal costs. <br />Please refer to the attached line item/quantity breakdown for items being eliminated from the <br />project. <br />2) The Soil Removal line item is needed for the disposal of unsuitable soils and the associated <br />tipping fees. The unsuitable soils are located at Northside Blvd through 215 feet north along <br />what will become St. Peter St. Soil to be removed is about 75 feet wide and 12 feet deep. <br />3) The Borrow line item is needed so structural backfill can be hauled in to replace the removed <br />unsuitable soils for use within the roadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.