Laserfiche WebLink
March 12, 1962 <br />A regular meeting of the Board of Public Safety was held on Monday, March <br />129 1962 at 10:00 A.M. CST. All members were present. Minutes of the last <br />regular meeting were read and approved. Vouchers were approved and ordered <br />paid to the various suppliers:, <br />OPENING OFF BIDS CENTRAL FIRE STATION ROOF) <br />The time now_being after 10:00 A.M. it was so announced and bids for the <br />construction of a new roof on Central Fire Station were opeded and read <br />aloud. Proofs of Publication from The South Bend Tribune with affidavit <br />signed by Robert DeLong and The Record with affidavit signed by Kathleen <br />Sweitzer were found sufficient. <br />The following bids were received: <br />La -Rite Roofing_ Comp any <br />South Bend, Indiana <br />Proposal for construction of new roof, Central Fire Station: <br />t:l r <br />Labor, materials, equipment and insurance to apply 15year built-up <br />Kopper's Tar and gravel roof and composition flashing;as per <br />specifications. $2,176.00 <br />National Surety Bond for an additional cost of 150.00 <br />Certified check for $250.00, signed by Mildred DeCook <br />and Remy Vrunt <br />Non -Collusion Affidavit, signed by C. F. Root, Secy. Treas. <br />Topco Co. <br />109 N. Hill St. <br />South Bend 17, Ind. <br />Proposal for construction of new roof, Central Fire Station: <br />15 year bonded, 4-ply built-up pitch, felt and gravel roof, <br />including cant strips, composition flashings 24-gauge galvanized <br />iron counter flashings and gravel stop on main roof at Central <br />Fire Station, 202 E. Wayne St., as per specifications $29450.00 <br />If dead -level bitumen and asphalt felt are used in liew of <br />coal tar pitch and tarred felt,_deduct 140.00 <br />Bid Bond for $250.00, signed by John F. Vurpillat <br />Non -Collusion Affidavit, signed by John F. Vurpillat <br />Midland Engineerinci Co.. Inc. <br />52369 U.S. 31 North <br />South Bend, Indiana <br />Proposal for construction of new roof, Central Fire Station: <br />Removal and re -roofing at Central Fire Station. <br />Base Bid Per Specifications <br />$2,975.00 <br />Voluntary Alternate: <br />For use of 43 lb. Universal base sheet and 2xl5 lb. and special <br />bitumen and gravel instead of the roofing specified our <br />alternate - Contract Price is $20845.00 <br />Check (not certified) for $297.509 signed by W. J. Alford <br />Non -Collusion Affidavit, signed by W. G. Collins, Mgr. <br />