My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Donohue & Associates, Inc - WWTP Belt Filter Press No. 4 Rehabilitation Engineering Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Donohue & Associates, Inc - WWTP Belt Filter Press No. 4 Rehabilitation Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:36:57 AM
Creation date
1/25/2017 10:03:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The actual and allowable costs of direct non -salary costs directly attributable to this <br />Contract are items such as fares, subsistence, mileage, equipment rentals, reproductions, <br />approved sub -consultant fees, etc. However, the direct non -salary costs for travel <br />reimbursement shall not exceed the limitations on travel expenses set out in the current <br />State of Indiana policy on travel reimbursement. <br />4. The ENGINEER shall not be paid for any service performed by the OWNER or services <br />not required to develop this Project. Costs for routine photocopy and paper reproduction, <br />cellular phone costs, mileage and computer time costs will not be paid as a reimbursable, <br />but is to be included in the above fees and overhead costs. <br />B. Method of Payment: <br />The ENGINEER may submit a maximum of one invoice per calendar month for work <br />covered under this Agreement. The invoice shall be submitted to the OWNER. The <br />invoice shall represent the value, to the OWNER, of the partially completed work as of the <br />date of the invoice. The ENGINEER shall attach thereto a summary of each pay item in <br />Section A of this Appendix, percentage completed and prior payments in a form <br />acceptable to the OWNER. <br />2. The OWNER for and in consideration of the rendering of the engineering services <br />provided for in this Agreement, agrees to pay the ENGINEER for rendering such services <br />the fee established above upon completion of the work thereunder, acceptance thereof by <br />the OWNER and upon the ENGINEER submitting an invoice as described above. <br />3. In the event of a substantial change in the scope, character or complexity of the work on <br />the project, the OWNER and ENGINEER shall execute, in writing, a supplemental <br />agreement prior to the ENGINEER providing any additional services. <br />Appendix 1, Standard Hourly Rates Schedule <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Pace 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.