Laserfiche WebLink
Change Order No.1 <br />Century Center <br />CEO Suite - Suite 17 Remodel <br />Project No. 116-010 <br />OWNER: City of South Bend <br />ENGINEER: Alliance Architects <br />CONTRACTOR: Holladay Construction Group <br />PROJECT: Century Center — CEO Suites — Suite 17 Remodel <br />Project No. 116-010 <br />SUBJECT: Change Order Number 1, Explanation of Costs <br />ISSUE DATE: January 24, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />The changes to the scope of work listed herein result from corrections to existing, and unforeseen, <br />conditions involving both general construction and electrical items. The changes to eliminate the new <br />door and sidelight to Suite 17 Room No. 101 and new exterior window in Conference Room No. 207, <br />and others, were directed by the Owner. <br />The work description for the changes applied to this change order is describe below: <br />Work Description: <br />1. <br />Delete all mirrors from the scope of work <br />Deduct <br />$640.00 <br />2. <br />Delete solid surface stall door from Toilet Room #103 <br />Deduct <br />$970.00 <br />3. <br />Add 3 (three) Type "A" wall mounted light fixtures to <br />Suite 17 Room No. 101 <br />Add <br />$964.00 <br />4. <br />Add door frames in Suite 17 (total 3) <br />Add <br />$400.00 <br />5. <br />Delete solid surface bar sink in Suite 17 — Room No. 101 <br />Deduct <br />$300.00 <br />6. <br />Add stainless steel bar sink to Lounge Room No. 200 <br />Add <br />$610.00 <br />7. <br />Delete new exterior window in Conference Room <br />No. 207 from the scope of work <br />Deduct <br />$7,892.00 <br />8. <br />Revise casework and add access panel in <br />Wet Bar/Closet Room No. 205 <br />Deduct <br />$440.00 <br />9. <br />Delete new entry door and sidelight to Suite 17 <br />Room No. 101 from the scope of work <br />Deduct <br />$4,442.00 <br />10. <br />Remove and replace existing acoustical ceiling tile <br />in Lounge Room No. 202—CCD No.5 <br />Add <br />$733.00 <br />SHEET 1 OF 2 <br />