Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Richard Estes, Engineer I <br />SUBJECT: Century Center — CEO Suite — Suite 17 Remodel <br />Costs related to change in scope of work resulting from unforeseen <br />conditions and program changes <br />Project No. 116-010 <br />DATE: January 24, 2017 <br />Here is an explanation for the Change Order being submitted. <br />The reason(s) for the Change Order request is as follows: <br />1. Removal of mirrors, delete solid surface restroom doors, delete new exterior window, and <br />new entry door and sidelite, etc. were deleted from the scope of work as directed by the <br />Owner. <br />2. Changes to casework in Wet Bar / Closet Room No. 205 resulting from unforeseen existing <br />conditions. <br />3. Changes to electrical feed above ceiling serving receptacles above wet bar in Lounge <br />Room No. 202, as a result of unforeseen conditions. <br />4. Add stainless steel bar sink and faucet in Lounge Room No. 202 to replace existing unit. <br />5. Remove and replace existing ceiling tile and grid in Lounge Room No. 202 to make entire <br />ceiling uniform. <br />The deduct amount for this work shall be $12,078.00. This represents a decrease of 5.86% for the <br />overall project cost. 28 calendar days are also being added to the completion date. <br />Please call me with your questions (5896). <br />