My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Century Center CEO Suites Suite 17 Remodel Proj No. 116-010 - Holladay Construction Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Century Center CEO Suites Suite 17 Remodel Proj No. 116-010 - Holladay Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:35:45 PM
Creation date
1/25/2017 9:51:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Richard Estes, Engineer I <br />SUBJECT: Century Center — CEO Suite — Suite 17 Remodel <br />Costs related to change in scope of work resulting from unforeseen <br />conditions and program changes <br />Project No. 116-010 <br />DATE: January 24, 2017 <br />Here is an explanation for the Change Order being submitted. <br />The reason(s) for the Change Order request is as follows: <br />1. Removal of mirrors, delete solid surface restroom doors, delete new exterior window, and <br />new entry door and sidelite, etc. were deleted from the scope of work as directed by the <br />Owner. <br />2. Changes to casework in Wet Bar / Closet Room No. 205 resulting from unforeseen existing <br />conditions. <br />3. Changes to electrical feed above ceiling serving receptacles above wet bar in Lounge <br />Room No. 202, as a result of unforeseen conditions. <br />4. Add stainless steel bar sink and faucet in Lounge Room No. 202 to replace existing unit. <br />5. Remove and replace existing ceiling tile and grid in Lounge Room No. 202 to make entire <br />ceiling uniform. <br />The deduct amount for this work shall be $12,078.00. This represents a decrease of 5.86% for the <br />overall project cost. 28 calendar days are also being added to the completion date. <br />Please call me with your questions (5896). <br />
The URL can be used to link to this page
Your browser does not support the video tag.