My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-05-16 Health and Public Safety
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2016
>
Health and Public Safety
>
10-05-16 Health and Public Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:44:33 PM
Creation date
1/24/2017 11:31:08 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
10/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
called for it or not. In the end, that is what his reasoning on why the higher percentage was <br />associated with the fixed cost as opposed to call volume. Some of the County Councilmembers <br />did suggest we should be revising some of these numbers based on call volume. Chief Cox stated <br />anecdotally as a department head, the majority of our costs are associated with personnel and not <br />call volume. Those personnel are in place in order to make calls or be ready to make calls at all <br />times of the day. If we make zero (0) calls in a twenty -four hour shift or three- hundred (300) <br />calls in a twenty -four (24) shift we are still going to pay the same amount of money in regards to <br />personnel, benefits, and equipment aside from maybe some bandages or water usage. As far as <br />personnel costs go, it is the same no matter how many calls are made. <br />Mr. Agostino stated he does believe that is accurate, particularly on the front end going in. Chief <br />Cox is right that you have a certain amount of cost you are going to incur no matter how many <br />calls you take. However, your calls might change if you go from 5,000 calls a month to 6,000 a <br />month because then you do pick up more personnel without necessarily expanding your other <br />costs. If we were to follow the staffing study that was done by the City, we would be at ninety - <br />nine (99) employees and looking at some true variable costs. Right now, we have a certain <br />amount of costs that are going to occur no matter how many calls we receive. That is why the <br />argument was made to treat the bulk of the costs as fixed costs and allocate based on a net - <br />assessed value. <br />Vice Committee Chair White asked when that staff report was done. <br />Chief Cox responded it was done fairly recently, around August. The Department of Innovation <br />did that study. <br />Mr. Agostino stated that was using modeling, if he understands it correctly, for a profit driven <br />call- center, not government based. It was maximizing what you can do out of a call- center. That <br />study backed up the advice that we received from the Operations Board members about staffing <br />and needing a certain amount of people to cover fire, police, and other types of calls. While it is <br />probably more than what was being recommended, it matches the recommendation that we need <br />to have more people staffing based on the volume we do have and based on the population. <br />Mr. Croymans stated one (1) of the nice things that the study did provide is it gave us peak hour <br />times, so even though we were only able to ramp up our staff by four (4) members we can put <br />them in on peak hour times and their work goes further. It was a very good study and we need to <br />thank South Bend as the one (1) agency that has actually stepped up to the plate to help us going <br />forward. <br />Council President Scott asked Mr. Croymans to give a quick overview of where we were and <br />where we are now and the status of the PSAP center as far as operational up and running <br />logistics. <br />Mr. Croymans responded by distributing a chart that is on file with the City Clerk's Office. This <br />is a high level overview but the columns off to the right are the ones that could affect our ability <br />to move into the center in December. On the building, obviously the physical plan of the building <br />is up and running. We do have some large issues with our server room, the air handlers are not <br />
The URL can be used to link to this page
Your browser does not support the video tag.