My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Equip Purchase for Nello Corp Phase XVI Proj No. 116-137 - The Lincoln Electric Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Equip Purchase for Nello Corp Phase XVI Proj No. 116-137 - The Lincoln Electric Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:02:16 AM
Creation date
1/12/2017 8:36:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
35000 Curtis Boulevard <br />Eastlake, OH 44095 <br />Phone:440-953-8000 <br />Fax:440-953-1706 <br />Website: www.radisson.com/eastlakeoh <br />Shuttle Service Available <br />Approximately 8 miles from Lincoln Electric <br />Cancellations are accepted prior to one week before a pre -scheduled training session. Company <br />cancellations within one week of a pre -scheduled training session forfeit one training slot. No-show <br />students forfeit all remaining company training slots. <br />The Lincoln Electric Company strictly prohibits smoking on company premises, including the <br />Automation facilities, and in the parking lot. <br />Fume Extraction <br />Lincoln Electric offers an extensive line of fume extraction systems for robotic cells. If this proposal does <br />not include a fume extraction option, contact Lincoln Automation to have it added. <br />The operation of welding fume control equipment is affected by various factors including proper use <br />and positioning of the equipment, maintenance of the equipment and the specific welding procedure <br />and application involved. Worker exposure level should be checked upon installation and periodically <br />thereafter to be certain it is within applicable OSHA PEL and ACGIH TLV limits. <br />Fume Extraction Equipment Service & Maintenance <br />Routine service and maintenance of the fume extraction system is required. Lincoln Electric does not <br />provide service and maintenance and it is not included in the fume extraction system quoted price. <br />To sustain an optimal system performance level, routine service and maintenance of the fume <br />extraction system is required. Based on the level of annual consumable usage, type of welding process, <br />condition of base metal and overall type of usage and air quality extracted through system, it is <br />recommended that the particulate drums beneath the Statiflex 400MS or 6000MS filter unit and <br />preseparator be emptied as needed. <br />Because the particulate matter collected in the unit may be hazardous, take necessary precautions so <br />that you and your fellow workers do not breathe the dust and particulate. Wear a suitable respirator <br />when disposing of the particulate. Follow local environmental regulations for disposal of filters and <br />particulate matter. <br />NOTE: Lincoln Electric Environmental Systems are designed specifically for welding fume particulate <br />extraction. <br />www.Iincolnelectric.com i <br />pg 27 a ,Au1toF11nfion <br />Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.