My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12222016 Board of Public Works Agenda
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
12222016 Board of Public Works Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:38:26 PM
Creation date
1/11/2017 8:52:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />DECEMBER 22, 2016 406 <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Base Bid <br />_ <br />$1,040,000 <br />AlternateNo. l <br />is35,000 <br />Alternate No. 2 <br />$55 000 <br />Upon a motion made by Ms. Dorau, seconded by Mr. Mueller and carried, the above bids were <br />referred to Engineering and Redevelopment for review and recommendation. — <br />OPENING AND AWARD OF QUOTATIONS — CORBY BOULEVARD SIDEWALK <br />IMPROVEMENTS —PROJECT NO. 116-087 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />RIETH-RILEY CONSTRUCTION CO.- INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Robert Nichols <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: Division A: $52,366.00 <br />Division B: $38,795.18 <br />Division C: $42,925.00 <br />WALSH & KELLY, INC. <br />24358 State Road 23 _ <br />South Bend, IN 46614 <br />Quotation was submitted by Dustin Hilary <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: Division A: $55,665.00 <br />Division B: $47,735.00 <br />Division C: $51,835.00 <br />PREMIUM CONCRETE SERVICES. INC <br />712 Richmond St. <br />Elkhart, IN 46516 <br />Quotation was submitted by Max Yeaky <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />QUOTATION: Division A: $63,750.00 <br />Division B: $52,600.00 —. <br />Division C: $58,000,00 <br />Upon a motion made by Ms. Dorau, seconded by Mr. Mueller and carried, the above quotations <br />were referred to Engineering for review and recommendation. After reviewing those quotes, Mr. <br />Kevin Fink, Engineering, recommended that the Board award the contract to the lowest <br />responsive and responsible quoter, Rieth-Riley Construction, in the amount of $91.161.18 for <br />Divisions A and B. Therefore, Ms. Dorau made a motion that the recommendation be accepted <br />and the quotation be awarded and the contract approved as outlined above. Mr. Mueller seconded <br />the motion, which carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.