10. Modify/refine path and/or crossing elements <br />11. Review environmental considerations <br />12. Review property interests/utility considerations <br />13. Meet and review with city staff for discussing and refining viable alternates <br />14. Revise and refine from comments received from city staff <br />D. Conduct a Stakeholder Open House meeting for presenting preliminary alignments, bridge <br />locations, and characteristic typical sections for the purpose of receiving feedback and comments. <br />A single open -forum type meeting shall be coordinated with the Owner. <br />E. Develop alignment exhibits/conceptual drawings reflecting lines, limits and features that are <br />superimposed on the aerial exhibits. <br />F. Develop Project Development Costs that will include both federal -aid and locally funded options. <br />Cost opinions shall be developed addressing preliminary engineering, right-of-way acquisition, <br />reimbursable utilities, and construction. <br />G. Descriptive narratives shall be developed to highlight and reinforce exhibits and conceptual <br />drawings. These narratives shall describe features that are not easily conveyed in graphic format <br />or otherwise reinforce visual exhibits. <br />A1.05 Develop Draft Master Plan <br />A. Prepare a Draft Master Plan that shall document analysis of viable alternatives and outline the <br />proposed recommendation that will be identified as the preferred alternative for each project <br />described in A1.04 item B. These Preferred Alternatives will represent a preliminary project <br />improvement plan, with refinements reserved for subsequent design phases in accordance with <br />either federal aid or locally funded requirements. The Draft Master Plan will be written as a <br />compilation of efforts to date, design aspects of each project, essential design data, analysis, <br />alternative development, comparisons, costs and findings. The Draft Master Plan will also <br />include the following: <br />1. Purpose and need description for each respective project <br />2. Document existing condition assessment extended from A1.03 deliverable. <br />3. Preferred alternate for five (5) projects/sections <br />4. Establish project priorities <br />5. Project development estimates / funding sources <br />6. Prepare implementation plan <br />B. Review the Draft Master Plan with city staff reviewing the preferred alternates preliminary bridge <br />concepts, and other material presented to confirm final direction on draft documents. Review <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />