My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:01:13 AM
Creation date
1/3/2017 3:02:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
session will consider alignment and bridge options, recommendations, facility standards, <br />stakeholder feedback, and other relevant development documents. <br />C. Finalize Master Plan <br />1. Revise the Master Plan from city comments received. <br />2. Develop Presentation Exhibits and preliminary plan graphics for each trail corridor to <br />define the location and alignment of the pedestrianibicycle facility in relation to the existing <br />conditions, site features, and other proposed improvements including concept graphics for <br />each bridge location to define bridge location, alignment, elevation, structure, and <br />connection to the proposed trail improvements. <br />Prepare aerial overview exhibit for use describing the finalized concepts and design to <br />include overall network plan, corridor plans, and facility standards and cross -sections. <br />4. Prepare visual presentation exhibits and coordinate meeting material with city staff. <br />5. Review the Master Plan with the City. <br />a. Provide electronic copies of the document to be circulated for feedback. <br />b. Revise the Master Plan based on comments provided. <br />6. Finalize Master Plan <br />a. Revise and refine the Master Plan based on feedback received from the Owner and <br />prepare the following deliverables: <br />1) Overall trail network plan exhibit <br />2) Concept layout and alignment plans for each of the three alignment corridors. <br />3) Conceptual layout and elevation plans for each of the two bridge crossings. <br />4) Concept typical cross sections to define pedestrian/bicycle facility width and <br />placement within the right-of-way <br />5) Prepared document that will include concepts, cost opinions, recommended <br />implementation plan to include phasing and sequencing of projects. <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed below. <br />Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.