My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:01:13 AM
Creation date
1/3/2017 3:02:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
signalized intersections, transit routes and stops, existing bicycle facilities, traffic counts, accident <br />data, speed limits, intersection safety and current level of use. <br />D. Review perimeter trail networks that are existing or planned by the Owner or other jurisdictional <br />agencies. <br />E. Review surrounding Bicycle Network(s) that are existing or planned by the Owner or other <br />jurisdictional agencies. <br />F. Prepare an existing Base Map from inventory activities described above. <br />A1.03 Conduct Stakeholder Meeting(s) <br />A. Prepare public display materials with information from A1.02 - Inventory Existing Shared -use <br />Network superimposed. <br />B. Conduct meetings with invited stakeholders to discuss existing conditions, potential bicycle <br />network connections, and other considerations which may impact the project. <br />1. Coordinate meetings to be conducted with local stakeholders invited by the City to allow <br />for their input on the master planning effort. <br />2. Conduct meetings with local stakeholders. Meetings will be conducted to gather <br />information from identified stakeholders regarding the existing inventory and potential <br />considerations for project ideas or considerations. These approximately four to five <br />meetings shall be conducted over the course of one day. <br />3. Prepare minutes documenting comments received from the stakeholder meeting(s). These <br />minutes will provide additional guidance for consideration by the Engineer and Owner as <br />part of the master planning effort. <br />C. Summarize existing conditions survey and field review results in annotated graphic format <br />utilizing aerial mosaic mapping, photographs, and notes from field review in conjunction with <br />stakeholder minutes and other considerations. <br />D. Conduct a meeting with the Owner to present the findings and receive additional direction on the <br />alternate development for respective projects. From this meeting develop the existing condition <br />assessment that will be extended in the finalized Master Plan. The following items will be <br />documented and delivered: <br />1. Brief summary of relevant plans and studies <br />2. Study Base Mapping <br />3. Summary of existing conditions and stakeholder input <br />4. Owner review meeting presentation materials and notes <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.