My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lawson Fisher Assoc. - Northshore Trails Master Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:01:13 AM
Creation date
1/3/2017 3:02:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 7 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated December 22, 2016. <br />Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Develop Base and Working Drawings <br />A. Engineer shall develop an Aerial Working Drawing <br />1. Develop a digital base drawing for use documenting the existing facility inventory and <br />developing proposed trail alignments and crossings using Indiana Map resources and City <br />of South Bend GIS datasets for an at -scale aerial map mosaic. The limits are <br />approximately LaSalle Avenue north through Angela Boulevard as the St. Joseph River <br />meanders south to north. <br />2. Imagery will reflect most recent available from City of South Bend at a 6-inch pixel <br />resolution. <br />3. Import Digital Elevation Model (DEM) data for the development of an existing condition <br />surface model for identifying vertical relief and changes in topography. <br />4. Refine the developed digital working drawing and develop other conceptual planhnetrics <br />for fixing locations by station and identify location and features by 100 ft increments or <br />stations. <br />5. Import from geographical information system (GIS) resources available information for <br />property boundaries, utilities and other features. <br />6. Develop roadway centerline stationing for identifying locations and other information as <br />may be required. <br />B. Secure detailed surface topographic survey data at constriction or other points of interest in the <br />proposed trail alignment phase for specific locations or areas as may be required or requested. <br />The Engineer shall provide necessary topographic survey and utility representation, for master <br />planning purposes. Surface topographic survey shall include: <br />1. Location and limit of hard surfaces, by type <br />2. Buried utility locations by virtue of IUPPS locates and as -built plans <br />3. Above grade utility appurtenances <br />4. Gravity sanitary and storm sewer facilities as further described below within this section. <br />(Exhibit A— Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.