Laserfiche WebLink
SUBCONTRACTORS 109.04 (fl <br />WEEK ENDING: November 18, 2016 <br />AMOUNT <br />TOTAL SUBCONTRACT WEEK ENDING <br />$2,282.50 (29) <br />10 %x LINE (30) $3,000.00 OR LESS <br />$228.25 (31) <br />7 %x LINE (30) OVER $3,000.00 <br />$0.00 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+ (31) + (32) <br />$2,510.75 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17). (22), (28) & (33) <br />1.1 % OF BOND RATE BASED UPON LINE (34) <br />10 % x LINE (35) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />Page 3 of 3 <br />$7,175.77 (34) <br />$78.93 (35) <br />$7.89 (36) <br />$7,262.60 (37) <br />