My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:56:08 PM
Creation date
12/14/2016 3:12:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INSURANCE. TAXES 109.04 <br />WEEK ENDING: November 18, 2016 <br />INSURANCE <br />TAXES <br />TOTAL'. LINE (13) + (14) $0.00 (15) <br />10 %x LINE (15) $0.00 06) <br />GRAND TOTAL FOR INSURANCE, TAXES: LINE (15) + (16) $0.00 (17) <br />MATERIAL 109.04 /d <br />WEEK ENDING: November 18, 2016 <br />MATERIALS PURCHASED: (10' Pipe, 21T k8 Gravel, 2Cyd Class A) $768.00 (18) <br />MATERIALS MANUFACTURED $0.00 (19) <br />TOTAL: LINE(1B)+(19) $768.00(20) <br />12 %x LINE (20) $92.16 (21) <br />GRAND TOTAL FOR MATERIALS: LINE (20) + (21) $860.16(22) <br />EQUIPMENT 109.04 /d) <br />WEEK ENDING: November 18, 2016 <br />CONTRACTOR OWNED EQUIPMENT <br />BLUE BOOK ADJUSTED <br />MONTHLY RATE HTB <br />WE <br />BLUE BOOK OPERATING <br />RATE -Ha <br />BLUE BOOK TOTAL <br />COST <br />E BOOK HOUR <br />HOURS <br />EXTENSION <br />PICK-UP TRUCK 3/4 TON <br />$8.751 <br />$12.481 <br />$21.231 <br />1 $0.00 <br />PICK-UP TRUCK TON <br />$9.891 <br />$13.781 <br />$23,671 <br />12.501 <br />$295.88 <br />FLATRACK TRUCK <br />$113.661 <br />$15.851 <br />$33.511 <br />1 <br />$0.00 <br />LOWBOY <br />$47.631 <br />$43.251 <br />$90.881 <br />1 <br />$0.00 <br />TILT TOP TRAILER <br />$6.501 <br />$2.85 <br />$9.351 <br />$0.00 <br />TRI-AXLE DUMP TRUCK <br />$38.121 <br />$41.101 <br />$79.221 <br />$0.00 <br />QUAD -AXLE DUMP TRUCK <br />$40.591 <br />$42.50 <br />$83.09 <br />$0.00 <br />CX76 EXCAVATOR <br />$46.541 <br />$16.951 <br />$62.491 <br />10.50 <br />$666.15 <br />CX210 EXCAVATOR <br />$73.261 <br />$36.10 <br />$109.361 <br />$0.00 <br />CX330 EXCAVATOR <br />$113.851 <br />$59,301 <br />$173,151 <br />$0.00 <br />850 DOZER <br />$53.891 <br />$26.3DI <br />$80.191 <br />$0.00 <br />SKIDSTEER <br />$26.601 <br />$15.201 <br />$41.801 <br />$0.00 <br />CAST 938 LOADER <br />$42.5BI <br />$23.651 <br />$66.21 <br />$0.00 <br />CAT 950 LOADER <br />$56.95 <br />$28.001 <br />$84.951 <br />1 <br />$0.00 <br />MAINTAINER <br />$41.37 <br />$20.151 <br />$61.521 <br />1 <br />$0.00 <br />GRADER 12 <br />$55.03 <br />$27.30 <br />$82.331 <br />$D.00 <br />GRADER 140 <br />$61.31 <br />$30.80 <br />$9111 <br />$0.00 <br />Dirt Roller <br />$34.95 <br />$22.75 <br />$57.70 <br />$0.00 <br />Asphalt Pave <br />$268.08 <br />$88.45 <br />$356.53 <br />$0.00 <br />Asphalt Distributor <br />$34.70 <br />$8.70 <br />$43.40 <br />$0.00 <br />ROLLER 3-5 TON <br />$78.59 <br />$27A0 <br />$105.69 <br />$0.00 <br />ROLLER 8-12 TON <br />$93.44 <br />$29.10 <br />$122.54 <br />$0.00 <br />AIR COMPERSSOR <br />$19.20 <br />$8.72 <br />$27.32 <br />$0.00 <br />TOTAL CONTRACTOR OWNED EQUIPMENT $952.02 (23) <br />RENTED EQUIPMENT (ATTACH DAILY COPIES OF INVOICES) $0.00 (24) <br />FUEL, LUBRICANTS AND TRANSPORTATION COSTS <br />$0.00 (25) <br />TOTAL LINES (23)+(24)+(25) <br />$952.02 (26) <br />12 % x LINE (26) <br />$114.24 (27) <br />GRAND TOTAL FOR EQUIPMENT: LINES (28)+(27) <br />$1,066.26 (28) <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.