Laserfiche WebLink
8/18/69 <br />STREET LIGHT INSTALLATION - SCHOOL FIELD AREA <br />Upon motion made, seconded and unanimously carried, the Board approved the <br />recommendation of the Traffic Engineering Department for the following: <br />(1) To increase the lights on Eddy between Jefferson and the <br />Cooper Bridge complet from 6,000 INC to 21,OOCUV. in,'.,10 <br />lights placed 150 feet apart. Cost $18.30 <br />(2) To increase the lights on the north side of the 1100 block <br />of E, South Street between Eddy and Sunnyside from the 3 - <br />1000INC to 6 - 7000 MV. cost $16.15 <br />(3) To increase_ the lights on the west side of the 500 block <br />S. Sunnyside from the present 2 - 1000 INC and 1 - 4000 INC <br />to 2 - 7000 MV. Cost $.65 <br />(4) replace the present 4000 INC at Parry and Wester with a <br />7000 MV. Cost $.90. <br />STREET LIGHT INSTALLATION - RILEY HIGH SCHOOL AREA <br />Upon motion made, seconded and unanimously carried, the Board approved the <br />recommendation of the Traffic Engineering Department for the following: <br />(1) Replace 4 - 4,000 INC on Fox St. between Fellows and Michigan <br />with 7,000 MV lights. Cost $3.60 <br />(2) Replace the 3 - 4000 INC on Donald Between Fellows and Michigan <br />with 71000 MV lights. Cost $2.70 <br />(3) Replace the 3 - 4,000 INC on Bowman Street between Fellows and <br />Michigan with 7,000 MV lights. Cost $2.70 <br />(4) Replace the 5 - 4,000 INC on Ewing between Michigan and Miami <br />with 7,000 MV lights. Cost $4.50 <br />(5) Replace the 3 - 4,000 INC on Fox between High and Miami with <br />7,000 MV lights. Cost $2.70 <br />(6) Replace the 4 - 1,000 INC on Donald between High and Miami with <br />a 7,000 MV at Donald and High and a 7,000 MV at mid -block between <br />High and Dale. Also replace the 4,000 INC on High and Dale and <br />mid -block between Miami and Dale with 2 - 7,000 MV lights.. Cost $7.00 <br />(7) Replace the 3 - 4,000 INC on Bowman between High and Miami with <br />71000 MV and replace the 1,000 INC with a 7,000 MV. Cost $4.45 <br />MAJOR STREET CLASSIFICATION MAP <br />Upon motion made, seconded and unanimously carried the Board adopts the street <br />classification system for the City of South Bend as prepared by the Area Plan <br />Commission as shown on the major street system map dated August, 1969, as amended <br />to include Marquette from Olive to Portage and Colfax Road from Portage to <br />Riverside. <br />PARKING STRUCTURES - MCRRIS ELECTRIC <br />The performance bond of Morris Electric for the installation in the Parking <br />Structures #1 and #2 was filed with the Board. <br />CONTRACTORS' BOND <br />The following contractors' bonds were received and filed with the Board: <br />Charles Berta - continued to 7/11/197 0 <br />Frank Frigyesi - to 6/6/1970 <br />STREET LIGHT OUTAGE REPORTS <br />Street light outage reports for 8/7/69 through 8/14/69 were received and filed <br />with the Board. <br />