3/io/69 <br />to give them an opportunity to show cause why these properties should not be <br />demolished, <br />12 N .H,_ ueZ <br />Bid of demolition awarded to Clifton Lee 9/17/68. Contract of $372.00 plus <br />$3% 00 for water shutoff was not fulfilled. A new request for bids having <br />been duly advertised, bids for demolition were opened as follows: <br />A Midwest Construction Co., non -collusion affidavit signed and.properly not- <br />arized, bid of $780.00 including water shutoff <br />Harvey R. Bryant, non -collusion affidavit signed and properly notarized. <br />Bid of $535.00 including water shutoff <br />After motion duly made, seconded and carried the bid of Harvey R. Bryant <br />was accepted, his being the lowest and best bid received. <br />It was further moved, seconded and carried that appropriate action be taken <br />against the defaulting contractor, Cliffton Lee, to recover the difference <br />zn:-cost from this bid and the previous bidder, Cliffton Lee. <br />712 S. Columbia <br />Bid of demolition awarded to A. & J. Demolition in April, 1968. Contract of <br />$623.00 was not fulfilled. A new request for bids having been duly advertised, <br />bids for demolition were opened as follows: <br />Harvey R. BX-yant, non -collusion affidavit signed and properly notarized. Bid <br />of $785.00 including water shutoff. <br />Upon motion made, seconded and carried, contract of demolition was awarded to <br />Harvey R. Bryant, his being the only bid received. <br />It was further moved, seconded and carried that appropriate action be taken <br />against the defaulting contractor, A. & J. Demolition, to recover the difference <br />in cost from this bid and the previous bidder. <br />425 S. William St. <br />Bid of demolition awarded to Cliffton Lee 12/23/68. Contract of $500.00 plus <br />$35.00 for water shutoff, was not fulfilled. A new request for bids having <br />been duly advertised, bids for demolition were opened as follows: <br />Harvey R. Bryant, non -collusion affidavit signed and properly notarized, bid <br />of $535.00 including water shutoff. <br />Upon motion made, seconded and carried, contract of demolition was awarded to <br />Harvey R. Bryant, his being the only bid received, <br />240 E, Paris St <br />Bid of demolition wwarded to Cliffton Lee 12/10/65, Contract for $455.00 plus <br />$35.00 for water shutoff was not fulfilled. A new request for bids having been <br />properly advertised, bids for demolition were opened as follows: <br />Harvey R. Bryant, non -collusion affidavit signed and properly notarized, bid of <br />$735.00 including water shutoff. <br />Upon motion made, seconded and carried, the bid of Harvey R. Bryant being the <br />only bid received, contract was awarded to Harvey R. Bryant. <br />It was further moved, seconded and,.. carried that appropriate action be taken N <br />against the defaulting contractor, Cliffton Lee, to recover the difference in <br />cost from this bid and the previous bidder, cliffton Lee, <br />1127 Campeau <br />This being the date set for opening of bids for demolition of 1127 Campeau, <br />the following bids were opened: <br />Hary ey R. Bryant, non -collusion affidavit signed and properly notarized, bid of <br />$750.00 including water shutoff. <br />Upon motion made, seconded and carried, this being the only bid received, contract <br />was awarded to Harvey R. Bryant, <br />