Laserfiche WebLink
�F <br />10/5/70 <br />Upon motion made, seconded and unanimously carried, the Board approved <br />street lighting, per recommendation of the Traffic Engineering Department,as <br />follows: <br />Grant Street between Linden and Orange: Install one 7,000L MV OH WP fixture <br />mid -block, at a cost of $ 5.00 per year. <br />Indiana Avenue (area bounded by Calvert, Franklin, the railroad, and Prarie <br />Avenue, including Indiana Avenue). <br />Install 17 7,000L MV OH WP <br />28 7,000L MV OH WP <br />35 20,000L MV OH SP <br />Remove 28 4,000L INC OH WP <br />35 10,000L INC OH SP <br />at a cost to the City of $158.95 per month. <br />Install 10 20,000L MV OH WP <br />18 20,000L MV OH WP <br />1 7,000L MV OH WP <br />1 7,000L MV OH WP <br />Remove 5 7,000L MV OH WP <br />2 6,000L INC OH WP <br />4 4, OOOL INC OH WP <br />at a cost to the city of $124.55 per month. <br />Rush Street (1700 block) <br />Install 1 7,000L MV OH W <br />at a cost to the City of $45.00 per year. <br />K-Mart Annexation Area (south of Ireland, west of Miami and east of Michigan) <br />Install 25 7,000L MV OH WP <br />at a cost of $93.75 per month. <br />Washington Street (Olive to Bendix Drive) <br />(K-Mart Annexation area approved <br />Install g 20,000L MV OH WP (With the exception of any proposed <br />3 20,000L MV OH WP (locations within the limits of the <br />(by-pass route.) <br />Remove 3 10,000L MV OH WP <br />At a cost of $52.55 per month. <br />Sussex Drive and area (bounded by Ardmore, Canterbury, Elwood and Sheridan) <br />Install 30 7,000L MV OH WP <br />12 7,000L MV OH WP <br />Remove 30 4,000L MV OH WP <br />at a cost of $72.00 per month. <br />Culver Place. <br />Upon motion made, seconded and carried, the matter of street lighting in <br />Culver Place was referred back to Traffic Engineering for clarification. <br />L <br />