My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/72 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1972
>
01/10/72 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:49:23 PM
Creation date
12/1/2016 11:01:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
1/10/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
175 <br />1/10/72 <br />Upon motion made, seconded and unanimously carried Mr. Cichowicz was granted <br />permission to attend the Weights and Measures Technical Training School in <br />Indianapolis January 19 through 21, 1972. <br />PETITION TO VACATE MEADE AND LONGLEY STREETS FOR SOUTH BEND PARK DEPARTMENT <br />James R. Seitz, Superintendent Department of Public Parks files with the Board <br />the petition to vacate Meade Street from Westmore to Roger and Longley Street <br />from Eclipse to Meade Street. Upon motion made, seconded and carried, the <br />petition was referred,simultaneously, to the Engineering Department and the <br />Area Plan Commission for study and recommendation. <br />CONTRACTOR"S BONDS APPROVED <br />Contractor's bonds were presented for approval for: <br />Bradberry Bros. Inc. to January 1, 1973 <br />Robertson Construction Co. to January 1, 1973 <br />Upon motion made, seconded and carried the above bonds were approved. <br />Continuation Certificates for Contractor's Bonds were presented for: <br />,C4 Industrial Sandblasting & Coating Co, to December 31, 1972 <br />Edward C. Hermann to January 1, 1973 <br />to <br />w Upon motion made, seconded and approved the above bonds were approved. <br />U <br />U Excavation Bonds were presented for: <br />Bradberry Bros. Inc. to January 1, 1973 <br />Boyd Construction Co. to January 6, 1973 <br />Mr. Sweeney asked that the standard forms for Contractors and Excavation <br />bonds be referred to 'the Engineering Department for study and review. <br />IRELAND ROAD IMPROVEMENT. <br />The following letter was presented. <br />Clyde E. Williams & Associates, Inc. January 7, 1972 <br />Board of Public Works and Safety <br />1300 County -City Building <br />South Bend, Indiana <br />Re: Ireland Road Improvement <br />Gentlemen: <br />In accordance with our contract, we are hereby submitting plan sheet tracings <br />for the Ireland Road Improvement Project. As -built information, as provided <br />by the City Inspector or from our own records, has been noted on the tracings. <br />Very truly yours, <br />CLYDE E. WILLIAMS & ASSOCIATES, INC. <br />Professional Engineers <br />GRP/jk (s) G. R. Phipps <br />CC to Engineer <br />Upon motion made, seconded and carried the above letter was ordered filed. <br />CRESTWOOD DEVELOPMENT CO. RETENTION BASIN <br />The matter of the purchase by the city of the retention Basin built by Crestwood <br />Development Company was continued for one week. <br />TRAFFIC REGULATION - MARQUETTE AT ANGELA BOULEVARD - OLD MONROE STREET <br />Upon motion made, seconded and unanimously carried, the Board approved the <br />recommendation of the Traffic Engineering Department to install a stop sign and <br />post on the Southeast corner of Marquette at Angela. Marquette will be used as <br />a detour during construction on North Shore Drive. <br />Upon motion made, seconded and carried the Board approved the installation of <br />a 24x24 STOP sign and post on the northeast corner of Old Monroe and Fellows Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.