My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/71 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1971
>
12/13/71 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:38:12 PM
Creation date
12/1/2016 10:46:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/13/1971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12/13/71 <br />149 <br />installation of a four-way stop at the intersection of LaSalle and <br />Sunnyside as recommended by the Traffic Engineering Department <br />STREET LIGHT REQUEST <br />Upon motion made, seconded and carried, the request of Dr. and Mrs. Max <br />Hostetler, 128 N. Tuxedo .-Driva, South Bend, Indiana, and eight others <br />for a street light in the 100 block of N. Tuxedo Drive was referred to <br />the Traffic Engineering Department for study and recommendation. <br />STREET LIGHTING APPROVED <br />Upon motion made, seconded and unanimously carried, the Board approved <br />street lighting recommended by the Traffic Engineering Department, as <br />follows: <br />Miami Street. Ewing to Ridgedale; Removal of 29 boulevard fixtures <br />and the installation of 25 traditionaire fixtures and three 20,000L MV UG CP <br />lights, at an increased cost of $126.75 per. -month. <br />Area bounded by Ewing,Miami Donmo er and Fellows Streets: The removal <br />of 79 existing tights and the installation of 96 traditionaire lights at <br />T__4 a cost of $322.30 per month. <br />EXCAVATION BOND TERMINATED - SELGE CONSTRUCTION COMPANY INC. <br />Upon motion made, seconded and unanimously carried, the Board approved the <br />termination of Travelers Indemnity Company Excavation Bond #1487366 for <br />Selge Construction Company, Inc. <br />11 <br />EXCAVATION BONDS <br />Upon motion made, seconded and carried, the Board approved the following: <br />Excavation Bond #553 51 79 in the National Fire Insurance Company of <br />Hartford, commencing l/l/72 for Selge Construction Company, Inc. <br />Certificates continuing excavation bonds for: <br />H. S. Altman, d/b/a Altman Co. - to 1/l/73. <br />Louis W. Krueper - to 1/l/73. <br />Place and Co. - to 1/l/73. <br />Edward J. White, Inc. - to 1/l/73• <br />CONTRACTORS' BONDS <br />Upon motion made, seconded and carried, the Board approved certificates <br />continuing contractors' bonds for the following: <br />Asher Construction, Inc. <br />Fred Black Construction Co., <br />Hartman Builders, Inc. <br />Hoekstra Concrete Co., Inc. <br />Place & Co., Inc. <br />Nick T. Prymak <br />Tiser Construction <br />- to 1/l/73. <br />Inc. - to 1/l/73. <br />- to 1/l/73. <br />- to 1/l/73. <br />- to 1/l/73. <br />- to 1/l/73. <br />- to 1/l/73. <br />STREET LIGHT OUTAGE REPORTS - for the period 12/1/71 to 12/7/71 were ordered filed. <br />There being no further business to come before the Board, the meeting adjourned <br />at 11:05 A.M. <br />A T�1� <br />Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.