My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/73 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1973
>
05/21/73 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:43:26 PM
Creation date
11/30/2016 11:34:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/21/1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MAY 21, 1973 <br />Denied Approved X <br />73-7 Prairie Avenue - Kerr to Ewing <br />Petitioner - Councilman Kopczynski. A fi-eld investigation reveals, like <br />Portage, partial business/industrial and residential,. It is recommended <br />that the existing system be replaced with mid span lights added to bring <br />it to arterial spacing. I•t is recommended that 20,000L MV OH WP be used <br />from Kerr to Dubai] and 7,000L MV OH WP from Dubail to Ewing. <br />Cost: <br />Replace 14 - 6,000L with 7,000 MV OH WP @ $.30/mo. $ 4.20 <br />Replace 11 - 6,000L with 20,000L MV OH WP @ $2.15/mo. 23.65 <br />Install 9 - 7,000 MV OH WP @ $3.75/mo. 33.75 <br />Install 8 - 20,000L MV OH WP @ $5.50/mo. 44.00 <br />$105.60/mo. or $1,267.20/yr. <br />Denied Approved X <br />73-8 Olive Street - Sample to Prairie <br />e-i Petitioner - Councilman Kopczynski. A field investigation shows the area very <br />sparsely lighted. The area is a combination industrial (some trailer traffic) <br />truck terminal and residential. It is recommended that the entire street be <br />Q relighted using 20,000L MV OH WP on existing wood poles. Through the <br />industrial area (Sample to Indiana) it -is recommended to use a longer spacing <br />with the 20,000 L MV fixtures. <br />Cost: <br />Replace 6 - 4,000L with 20,000L MV @ $2.75/mo. $28.50 <br />Replace 4 - 6,000L with 20,000L MV @ $2,15/mo. 8.60 <br />Install 1 - 7,000L MV @ $3.75/mo. 3.75 <br />Install 17- 20,000L MV @ $5.50/mo. 93.50 <br />$134.35/mo. or $1,612.20/yr. <br />Denied Approved X <br />73-10 2800 West Ford <br />Petitioner: Alex Niespodziany via James Barcome & Councilman Kopczynski <br />A field check reveals three business buildings in this one,block. It is <br />recommended that a 7,000L MV OH be installed on an existing wood pole. <br />Cost: <br />Install 1 - 7,000L MV OH WP @ $3.75/mo. or $45.00/yr. <br />Denied Approved X <br />73-11 Huron - east of Kosciuszko <br />Petitioner - Valerie Biebuyck, et al Councilman Szymkowiak. A field <br />check revealed a business place with the New Jersey RR crossing. The <br />existing lights do not cover this area. It is recommended that a 7,000L <br />MV OH WP be installed on Huron at the alley east of Kosciuszko. <br />Cost: <br />Install 1 - 7,000L MV OH WP @ $3.75/mo. or $45.00/yr. <br />Denied Approved . X <br />73-12 Penn Central RR - Prairie to Washington <br />Petitioner: Robert Fujawa and G. Ladewski. Original petition was for two <br />individual locations. In continuing the modernization of the City's street <br />lighting system, it is recommended that the,area be relighted. <br />Cost: <br />Remove 2 - 4,000L INC @ $2.60/mo. - $ 5.20 <br />Replace 20 - 4,000L with 7,000L MV @ $.90/mo. 18.00 <br />Replace 2 - 4,000L with 20,000L MV @ $2.75/mo 5.50 <br />Install 35 - 7,000L MV @ $3.75/mo. 131.25 <br />Install 2-- 20,000L MV @ $5,50/mo 11.00 <br />$160.55/mo. or $1,926.60/yr.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.