Laserfiche WebLink
REGULAR MEETING APRIL 9, 1973 <br />The assessment rate of $5.30 per front foot is the maximum rate which <br />could be assessed since it was the rate quoted in the preliminary estimate <br />and given at the public hearings. In addition, at the public hearing before <br />the Common Council, the City agreed to pay 25%.df :the project cost. The <br />City share as shown above would fulfill that requirement, although the <br />assessment rate would not be reduced. Of the estimated engineering cost it <br />should be noted that $1,584.83 has been paid. If the project is not con- <br />structed, the estimated engineering cost will be $2,750.00, including that <br />already paid. <br />Although the Board could reject all bids and advertise for new proposals <br />it is our opinion that the two contractors which submitted proposals April 2, <br />1973 would not decrease their prices. Because of the difference between the <br />two bids -it is possible that the -tow bid would be increased. Although some <br />other contractor might submit a proposal for a second opening it is not <br />expected that such a bid would be significantly lower than those which have <br />been received and published. It is,therefore, our recommendation that a <br />contract be awarded to McIntyre & Jones Construction Co., Inc., on the basis <br />of their low bid of $18,947.50. <br />Vary truly yours, <br />s/ Gerald R. Phipps <br />Upon motion made, seconded and carried, the recommendation was tabled for <br />further study by the Board. <br />REQUEST TO ADVERTISE FOR BIDS - FIRE DEPARTMENT <br />The Board received the following letter: <br />April 6, 1973 <br />Board of Public Works <br />13th Floor, County -City Building <br />South Bend, Indiana 46601 <br />Honorable Members of the Board: <br />The two (2) in-service ambulances of the South Bend Bureau of Fire are <br />badly in need of replacement under our normal replacement -schedules. <br />Neither of them meets with the expanded needs and requirements that we <br />must meet for emergency care of the sick and injured. <br />Enclosed are the specifications drawn that we feel meet our requirements. <br />We are requesting permission to advertise for the purchase of two (2) <br />ambulances under the enclosed specifications. <br />Your immediate attention to this matter would be greatly appreciated. <br />Respectfully submitted, <br />SOUTH BEND BUREAU OF FIRE <br />s/ Jack R. Bland <br />Fire Chief <br />Mr. Barcome explained that it had been thought that the Federal Government <br />would pay for half the cost of the new ambulances. They have investigated this <br />possibility and it now appears that this funding will not be available. The <br />Department is in dire need of new ambulances. Upon motion made, seconded and <br />carried, the Board approved the Chief's request and directed the Clerk to <br />advertise for bids on April 13th and 20th, with bids to be received on <br />April 23, 1973. <br />