Laserfiche WebLink
2 <br />12/4/72 <br />November 24, 1972 <br />Board of Public Works and Safety <br />City of South Bend <br />County City Building <br />South Beno, Indiana <br />Subject: Vacuum Street sweeper bids <br />Gentlemen: <br />I recommend the bid be awarded to Ries Equipment Company for two <br />(2) Elgin Whirlwind Street Sweepers. Ries Equipment was low bidder <br />and it is my opinion the Elgin Whirlwind is more acceptable to our <br />application. <br />Yours truly, <br />s/ D. L. Decker, Street Commissioner <br />Upon motion made, seconded and carried, the Board accepted the <br />recommendation of Mr. Decker and awarded the bid for two (2) <br />Elgin Whirlwind Vacuum Street Sweepers to the Ries Equipment <br />Company, their bid being, in the Board's opinion, the lowest <br />and best bid received. <br />EXCAVATION AND CONTRACTOR'S BONDS APPROVED: <br />Upon motion made, seconded and carried, the Board approved the <br />following bonds: <br />Excavation Bond <br />Donald <br />D/ White <br />to 12/1/73 <br />Excavation Bond <br />Ora S. <br />Frame & <br />Son to 12/31/73 <br />Excavation Bond <br />Place <br />& Company <br />told/74 <br />Contractor's Bond <br />Place <br />& Company <br />tol/l/74 <br />Contractor's Bond <br />H. G. <br />Christman <br />Construction Co. to 12/31/73 <br />CONTRACTOR'S BONDS AND EXCAVATION BONDS RECEIVED <br />Upon motion made, seconded and carried, the following bonds were <br />received by the Board and referred to the Bureau of Engineering <br />for investigation and report: <br />Contractors Bond Wilton F. Seymore DBA 3 Way Construction <br />to 12/31/73 <br />Hoekstra Concrete Contractors Bond to December 31, 1973 <br />Contractor's Bond Hartman Builders to l/l/74 <br />Excavation Bond Asphalt Engineers, Inc. to 12131/73 <br />Albert A. Spromberg Contractor's Bond to 11/30/73 <br />Contractors Bond Selge Construction to 12/31/73 <br />BOARD APPOINTS APPRAISERS <br />Upon motion made, seconded and carried, the Board appointed Reginald <br />Howard and Philip Ostreicher as appraisers for city owned land. <br />STREET LIGHT INSTALLATION <br />Upon motion made, seconded and carried, the Board approved the in�r <br />stallation of two parking meters in the three bundred block of <br />South LaFayette Boulevard. <br />Two additional parking meters can be installed in space at curb <br />formerly used for right turn lane before West Wayne Street was made <br />one way West. <br />