My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/16/74 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1974
>
12/16/74 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:37:11 PM
Creation date
11/29/2016 11:17:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/16/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR 14EETING DECEMBER 16, 1974 <br />COMPLAINT RE: 816 S. PHILLIPA` <br />The Board received a complaint regarding the alleged non -conforming <br />use of -the property at 816 S. Phillipa Street. Upon motion made, <br />seconded and carried, the complaint was referred to the Bureau of <br />Buildings for review and recommendation. <br />PAYMENT REQUEST NO. 38 APPROVED - WASTEWATER TREATMENT PLANT ADDITIONS <br />The Board received Payment Request No. 38 for the Wastewater Treatment <br />Plant Additions from Sollitt Construction Company in the amount of <br />$36,700.03. Upon motion made, seconded and carried, the payment request <br />was approved. <br />BONDS APPROVED <br />Ray S. Andrysiak, Bureau of Engineering, recommended approval of the <br />following bonds: <br />Excavation <br />Bond <br />for <br />Asphalt Engineers to 12/31/75 <br />0 <br />Excavation <br />Bond <br />for <br />Raymond Hoffman, Inc. to 12/31/75 <br />CC <br />Excavation <br />Bond <br />for <br />H. DeWulf Mechanical Contractor to 12/31/75 <br />Excavation <br />Bond <br />for <br />Vic Trippel to 12/31/75 <br />Excavation <br />Bond <br />for <br />Raymond Guzman d/b/a ABC Plumbing to 12/31/75 <br />Excavation <br />Bond <br />for <br />Frame and Son to 1/l/76 <br />Excavation <br />Bond <br />for <br />Louis McEndarfer to 11/7/75 <br />Contractor's <br />Bond for Hartman Builders, Inc. to l/1/76 <br />Excavationd for <br />Guy <br />Rizek to 12/31/75 <br />Excavation <br />Bond <br />for <br />Robert W. Frame to 12/31/75 <br />SCHEDULE OF ACTIVITIES RIVER BEND PLAZA <br />A Schedule of Activities on River Bend Plaza from December 14 through <br />2.4 was received. Upon motion made, seconded and carried, the schedule <br />was ordered filed. <br />STREET LIGHT OUTAGE REPORT FILED <br />Upon motion made, seconded and carried, the -Street Light Outage Report <br />for the period of December 4 through December 11 was received and <br />ordered filed. <br />RELEASE OF BOND APPROVED <br />A request to release the Sidewalk Bond for Crest Manor, Section 8 <br />was referred to the Bureau of Public Construction for recommendation. <br />Patrick McMahon, Manager of that Bureau, reported to the Board that <br />the sidewalks have been -installed and the bond can be released. <br />Upon motion made, seconded and carried, the bond was released, effective <br />December 16, 1974. <br />There being no further business to come before the Board, upon motion <br />made, seconded and carried, the meeting adjourned at 10:15 a.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.