My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Wastewater Treatment Plant Grit Screenings & Improvements Proj No. 114-075 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No 1 - Wastewater Treatment Plant Grit Screenings & Improvements Proj No. 114-075 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:46:56 PM
Creation date
11/23/2016 9:25:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IF <br />THI Tf:AIAN <br />�.._.... <br />521 W. 84th Drive <br />Engineer: Greeley and Hansen <br />work to <br />SUMMARY OF DETAILED BREAKDOWN <br />LABOR <br />MATERIAL <br />EQUIPMENT <br />OTHER COSTS <br />I. SAFETY <br />2. EXPENDABLE TOOLS <br />NETTOTAL <br />OVERHEAD AND PROFIT <br />TOTAL WORK PERFORMED BY CONTRACTOR <br />Contractor's / Subcontractor's <br />Change Order Request Summary <br />Date: 9/19/2016 COR: 4 R1 <br />Owner: City of South Bend <br />Project: South Bend Grit and Screenings <br />Improvements <br />TO Job # <br />iron pipe fabricated for the spray loops in both tanks. <br />Additions <br />(1%of LABOR)- Deletion -0- <br />(3.0% of LABOR)- Deletion -0- <br />(A+B+C+01+D2) <br />(Ex15%) - Deletion -0- <br />(Lines E+F) <br />CONTRACTOR'S MARK-UP ON WORK OF SUBCONTRACTORS <br />Detailed Breakdowns and summaries from each contractor must be attached. <br />SUBCONTRACTOR: Firm Name <br />1. Delta <br />2. <br />3. <br />4. <br />Deletions Net Total <br />CONTRACT WORK: Description PROPOSAL <br />Add prep and painting $2,200.00 <br />SUBTOTAL of all work performed by contractor's subcontractors <br />$2,200.00 <br />MARK-UP on work of subcontractors (Min. $ Do) <br />(Line H x 5%) <br />$110.00 <br />PROPOSAL <br />(Lines G+H+I) <br />$2,310.00 <br />BONDS <br />(1.5%of PROPOSAL) <br />$34.65 <br />BUILDER'S RISK INSURANCE <br />(0.0%of PROPOAAL) - Deletion -0- <br />$2,344.65 <br />TOTAL PROPOSAL <br />TOTAL PROPOSAL for subject CDR increase (decrease) in contract amount $2,344.65 <br />An extension time of 0 day to extend the Contract dates for Completion will be required commencing on <br />the date when we are notified a Change Order will be issued for the price quoted herein. Approval needed in 5 days. <br />If the work has to be performed to continue construction with no response on pricing or if we are issued a Work <br />Change Directive (WCD) to proceed with this work and agreement on the price has not been reached within 30 <br />calendar days, then this proposal shall be considered a Claim, in accordance with Article 10.5 of the <br />Contract General Conditions. <br />CONTRACTOR <br />Signature Malt Atce'oy. Title: PM Date: 9/19/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.