Laserfiche WebLink
�� <br />THIENEMAN <br />CONSl0.11CTI0N,INt. <br />September 20, 2016 <br />Greeley and Hansen <br />7820 hmovation Blvd. Suite 150 <br />Indianapolis, IN 46278 <br />Attn: Mr. Trent Montemayor <br />Subj: South Bend Grit and Screenings <br />Proposed Change Order #4 RI <br />Mr. Montemayor: <br />Please refer to Change Order Request #4 RI to sand blast and coat the black iron pipe loops <br />submerged in the East tank and West tank. The spray loops piping was called out as black iron <br />pipe. The prep and coating will provide extended service life of the piping. TCI agrees to have <br />our subcontractor Delta Paintings perform this work without any additional markup from TCI. <br />Please increase the contract amount by Two Thousand Three Handred Forty Four Dollars and <br />65 cents ($2,344.65) in the next change order issued for COR #4 RI . Feel free to contact me with <br />any questions. <br />Respectfully, <br />Watt ?&I tCoq <br />Matt McCoy <br />Project Manager <br />Cc: Field, File, Accounting <br />INDUSTRIAL • MUNICIPAL CONTRACTOR <br />521 W. 84" Dr. • Suite A • Merrillville, IN 46410.219-947-4700 • Fax 219-947-4711 <br />17219 Foundation Pkwy • Westfield, IN 46074 •317-867-3462 . Fax 317-867-3463 <br />