Laserfiche WebLink
ADDENDUM NO. 1 <br />To the Contract Document and Project Specifications for the <br />BERLIN PLACE SITE DEVELOPMENT <br />116-089 <br />CITY OF SOUTH BEND, INDIANA <br />Date: November 14, 2016 <br />To: All holders of the contract document for the above project. <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 —CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART 1 - CLARIFICATIONS <br />1.01. Attached is the sign -in sheet, agenda and meeting notes from the Pre -bid meeting held on <br />November 8, 2016. <br />1.02. The City of South Bend has scheduled project award for Tuesday, November 22, 2016. <br />PART 2 — SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISIONS, Page 4, Section XDI, Prosecution and Progress, Section B, Item 3: <br />1. REVISE: Final completion of the project shall be May 1, 2017. <br />2.02 SPECIAL PROVISIONS, Page 25, Section XLVIII, Structure Backfill <br />1. ADD: Structure Backfill shall be used as trench backfill to the top of the storm or sanitary <br />sewer pipe. The remainder of the trench shall be backfilled with INDOT B-Borrow <br />granular fill material, or an approved equal. INDOT B-Borrow, or an approved equal, shall <br />be used as backfll in excavations for Pipe Removal, Structure Removal and Existing <br />Foundation, Debris Removal and Replacement, full depth. <br />2. ADD: B-Borrow will be paid for at the contract unit price for "B-Borrow.... CYS" as <br />indicated on the itemized proposal sheet. <br />2.03 SPECIAL PROVISIONS, Page 17, Section XXXVI, Removal of Concrete Sidewalk, Curb <br />Ramps and Approaches <br />A. Items B, No. 1 <br />Berlin Place Site Development (1 I6-089) Addendum # 1 <br />November I4, 2016 Page 1 <br />