My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/24/77 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1977
>
01/24/77 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:47:15 PM
Creation date
11/17/2016 1:18:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
1/24/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M <br />r� <br />1 <br />LI <br />REGULAR MEETING JANUARY 24, 1977 <br />CENTURY CENTER CHANGE ORDERS -APPROVED <br />Patrick 11. McMahon submitted to the Board change orders in <br />Century Center contracts in the amount of $5,905.00. The <br />Change Orders were as follows: <br />Contract 003 Concrete - An addition of $246.00 for the <br />installation of styrofoam insulation to protect underfloor duct <br />work. <br />Contract 004 - Concrete, Masonry and Carpentry An addition <br />of $2,555.00 for the construction of a spiral staircase in the <br />theatre area. A deduction of $15.00 reflecting miscellaneous <br />concrete and masonry adjustments. <br />Contract 005 - Structural Steel. An addition of $195.00, reflecting <br />an adjustment in miscellaneous structural steel details to <br />accommodate building utilities. <br />Contract 017 - Roll -up Grills. An addition of $195.00, reflecting <br />a dimensional modification of the roll -up grills located in the <br />Art Wing. <br />Contract 039 - Heating, Ventilating, Air Conditioning. An <br />addition of $106.00, reflecting a minor- modification to the <br />thermostatic controls of certain heaters. <br />Contract 040 - Plumbing. An addition of $2,458.00, for the installation of <br />two-inch insulation on the sanitary drain lines beneath the Art <br />Center. <br />Contract 041 - Plumbing. An addition of $513.00 and a deduction <br />of $348.00. This net change of $165.00 results from the modification <br />of the gas line entering and servicing the Art Center Wing of <br />Century Center. <br />Mr. McMahon said the total anount paid -contractors on Century <br />Center to date is $189,954.26 and the balance in the contingency <br />fund is $60,000.00. Upon motion made by Mr. McMahon, seconded by <br />Mr. Brunner and carried, the Board approved the Century Center <br />change orders. <br />There being no further_ business to come before the Board, upon <br />motion made by Mr — McIlahon, seconded by Mr. Brunner and carried, <br />the sleeting adjourned at 11:16 a.m. <br />ATTEST: <br />a S <br />Patricia DeClercq, Cler:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.