My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:57:02 PM
Creation date
11/9/2016 10:14:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 27 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />SPECIFICATIONS: <br />The following special provision of the Contract Documents has been revised and is issued as a <br />part of this Change Order: <br />C)OO(1X. LIGHT POLE FOUNDATION <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 807 <br />Additions: <br />1. Each Street Light and Drive light will be mounted on a concrete foundation, as <br />shown on the plans. <br />2. The contractor is advised to order lighting materials as soon as possible due to <br />the project schedule limits. <br />3. The cost of the Light Pole Foundation shall include the anchor bolts, reinforcing <br />steel, grounding, concrete, materials, labor, equipment and appurtenances <br />required to construct the foundation complete and in place. <br />4. Light Pole FoURdation will be paid f9F at the GentraGt �nit price faF "Light Pole <br />N "pvsal w�^car <br />4. Standard drilled shaft foundations will be paid for at the contract unit price for <br />"Light Pole Standard Foundation, 2FT diameter X 6FT diameter... EACH" as <br />indicated on the itemized proposal sheet. <br />5. Spread footer foundations will be paid for at the contract unit price for "Light Pole <br />Foundation, Spread Footer... EACH" as indicated on the itemized proposal sheet. <br />DRAWINGS: <br />The following sheets have been revised or issued as new sheets. <br />Division B Revision 16 <br />Sheet 183-1 —Added Sheet <br />END OF CHANGE ORDER NO. 27 <br />Sheet 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.