My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:57:02 PM
Creation date
11/9/2016 10:14:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hawk Signal Controller <br />Description <br />MATERIALS <br />City <br />Unit <br />Description <br />Unit Cost <br />Total Cost <br />6 <br />Each <br />Hybrid Signal Hardware - Span Mount <br />$311.00 <br />$1,866,00 <br />1 <br />Each <br />Controller ASC/3-21 00 <br />$2,711.00 <br />$2711.00 <br />2 <br />Each <br />San Wire Junction Box <br />$167.00 <br />$334.00 <br />8 <br />Hr <br />Traffic Control Corp- Assist , <br />$75.00 <br />$600.00 <br />-------------- <br />1 <br />.............. <br />-------------- <br />LSM <br />......I------- <br />---------------------------------------------------------------- <br />Total Above <br />Misc. Materials ( 5 %) <br />------- --------------------------------------------------------- <br />Total Materials <br />---------------- <br />---------------- <br />----------------- <br />$6,511.00 <br />$275.55 <br />-- ---------- -- <br />$5,786.55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.