My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 8 - South Bend One-Way to Two-Way Conversion - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:57:02 PM
Creation date
11/9/2016 10:14:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hawk Signal Controller <br />PAGE 3 OF 3 <br />SUBCONTRACTS : 109.06 (f) <br />SUBCONTRACTS WEEK ENDING : <br />URN PH<S <br />• TOTAL. SUBCONTRACTS WEEK ENDING (27) <br />TOTAL SUBCONTRACTS TO DATE - (28) <br />10% X LINE (28 ), FOR FIRST $3,000.00 (20 ) <br />7% X BALANCE OF LINE (28), IF LINE (28) IS OVER $3,000 -- (30) <br />GRAND TOTAL SUBCONTRACTS: LINES (28)+(29)+(30) (31) <br />TOTAL: LINES (12). (17). (20), (26). 8 (31) $7,035.12 (32) <br />1.1% BOND RATE BASED UPON LINE (32) (33) <br />10% X LINE (33) (34 ) <br />TOTAL EXTRA WORK : LINES (321 + (33) + (34) S7,835.12 (35 ) <br />xQTEs: <br />1) ATTACH LOPIM OP MILV THE BHEETE SHOWWO IABON AND OONIRA ."WNED EQUIPMENT. <br />N 9UEOOMRACTOR6 USE FMQE81 ANO R Me PRIME OONTRACTORS ATIAOH TO PAGE 9. <br />91, ATTACH ORUM)OWN roR EACH INOVNUAL <br />ITHIO POW MAY BE PHOTOCOPIED OR REPRINTED AS NECESSARY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.