My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/30/84 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1984
>
04/30/84 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:37:44 PM
Creation date
10/27/2016 1:57:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/30/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />REGULAR MEETING APRIL 30, 1984 <br />Mr. Leszczynski further advised that favorable recommendations. <br />have been received from the Police Department, Department of Code <br />Enforcement and the Bureau of Traffic and Lighting for the above <br />application. It was noted that Mr. Becht provided a letter from <br />the property owner of 2313 Edison Road giving him permission to <br />locate his stand at that location. Upon a motion made by Mr. <br />Leszczynski, seconded by Mr. Vance and carried, the above <br />application was approved and referred to the Deputy Controller's <br />office for issuance. <br />APPROVE TRAFFIC CONTROL DEVICES <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Hill and <br />carried, the following four (4) traffic control devices were <br />approved: <br />REINSTALLATION OF RESIDENTIAL PARKING - 814-816 N. Main. <br />(Erroneously removed with order for hospital -owned, <br />non residential properties). <br />INSTALL STOP SIGN - On Ryer at Elwood. (Uncontrolled <br />"T" intersection). <br />INSTALL STOP SIGN - On Kenmore at Elwood. (Uncontrolled <br />"T" intersection). <br />INSTALL STOP SIGN - On Wellington at Elwood (Uncontrolled <br />"T" intersection). <br />APPROVE CONTRACTOR'S BOND <br />Mr. Melvin B. Humphrey, Engineering Department, recommended that <br />the Contractor's Bond for Abe's Free Flow be approved effective <br />retroactive to April 24, 1984. Upon a motion made by Mr. <br />Leszczynski, seconded by Mr. Hill and carried, the above I <br />Contractor's Bond was approved. <br />FILING OF STREET LIGHT OUTAGE REPORT <br />The report submitted to the Board indicated a total of thirteen <br />(13) outages for the period April 6, 1984 to April 19, 1984. <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Hill and <br />carried, the report was filed. <br />FILING OF ENVIRONMENTAL CLEAN-UP OF LOTS REPORT <br />A report from the Department of Code Enforcement indicating a <br />total of fifty-three (53) properties cleaned from April 23, 1984 <br />to April 27, 1984 was submitted. Upon a motion made by Mr. <br />Leszczynski, seconded by Mr. Hill and carried, the report was filed. <br />APPROVE CLAIMS <br />Mr. Michael L. Vance, City Controller, submitted Claim Docket No. <br />8273 through Claim Docket No. 8687 and recommended approval. Upon <br />a motion.made by Mr. Leszczynski, seconded by Mr. Hill and carried, <br />the claims were approved and the above request was filed. <br />INTRODUCTION OF NEW STAFF MEMBER TO THE DEPARTMENT OF PUBLIC WORKS <br />Mr. Leszczynski introduced Mr. Joseph Pluta who is a new staff <br />member of the Department of Public Works. Board members welcomed <br />Mr. Pluta to the City administration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.