Laserfiche WebLink
REGULAR MEETING <br />MARCH 19, 1984 <br />ARCO ENGINEERING CONSTR. CORP. Bid was signed by Jack Riegsecker, <br />705 South Beiger Vice -President and Jerry Rendall, <br />Mishawaka, Indiana 46544 Secretary, Non. -Collusion Affidavit <br />was in order and a 5% Bid Bond was <br />submitted. <br />TOTAL AMOUNT OF BID: $140,839.00 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Hill and <br />carried, the above bids were referred to the Engineering Department <br />for review and recommendation. <br />AWARD BID - TWO (2) SINGLE AXLE DUMP TRUCKS <br />In a letter to the Board, Mr. Sean Watt, Director, Division of <br />Transportation, indicated that he has reviewed the bids received <br />on March 12, 1984 for two (2) single axle dump trucks and recom- <br />mends that the bid of Western International Trucks, Inc., 4849 W. <br />Western Avenue, South Bend, Indiana, for two (2) dump trucks in <br />the amount of $51,760.00 be awarded. He further indicated that <br />the bid of Shamrock Ford is not being recommended since they did <br />not meet the minimum 155 h.p. engine rating in the base bid. Upon <br />a motion made by Mr. Leszczynski, seconded by Mr. Hill and carried, <br />the above recommendation was accepted and the bid awarded. <br />AWARD BID - ONE (1) HOT/COLD PAINT STRIPER, SELF PROPELLED <br />In a letter to the Board, Mr. Leszczynski indicated that after a careful <br />review of the bids received on March 5, 1984 for one hot/cold paint <br />striper, it is the recommendation of the Bureau of Traffic and <br />Lighting that the bid be awarded to Reid -Holcomb Company, Inc., <br />3333 W. Coliseum Boulevard, Fort Wayne, Indiana, for a Unimasco <br />Model -Imperial 10,000 with options of twin 60-gallon paint tanks, <br />outrigger, complete, cone platform, engine and drive train to <br />obtain 25 MPH travel speed and hot/cold hand gun package for a <br />total price of $32,767.33. Upon a motion made by Mr. Leszczynski, <br />seconded by Mr. Vance and carried, the above recommendation was <br />accepted and the bid awarded. <br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION <br />AFFIDAVIT - SOBENITE SANITARY SEWER PROJECT <br />Mr. Leszczynski advised that Dye Plumbing and Heating, Inc. has <br />submitted Change Order No. 1 (Final) indicating that the contract <br />amount be decreased by $138.62 for a new contract sum including <br />this Change Order in the amount of $8,215.35. Additionally <br />submitted was the Project Completion Affidavit indicating this <br />new final cost. Upon a motion made by Mr. Leszczynski, seconded <br />by Mr. Hill and carried, Change Order No. 1 (Final) and the <br />Project Completion Affidavit were approved subject to the filing <br />of the appropriate three-year Maintenance Bond. <br />APPROVE STORM WATER EASEMENTS <br />Mr. Leszczynski presented to the Board two (2) Storm Drainage <br />Easements from the North Central Indiana Development Partnership <br />to the City of South Bend. The first Easement is a permanent <br />easement for the purpose of entering upon certain described land <br />in order to establish and maintain a basin for the retention of <br />surface water drainage over and upon the real estate. The <br />second Easement is an easement granting to the City the right <br />to enter upon certain described land and grade, level, fill, <br />maintain and repair storm water retention facilities embraced <br />within the easement as may be reasonably necessary for storm <br />sewer purposes. Mr. Leszczynski advised that these easements <br />are needed for the development of Landmark Business Park. Upon <br />a motion made by Mr. Leszczynski, seconded by Mr. Hill and <br />carried, the above Easements were accepted and approved. <br />