My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10112016 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
10112016 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:40:51 PM
Creation date
10/25/2016 11:13:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 11, 2016 319 <br />SELGE CONSTRUCTION CO. INC. <br />2833 South 11" St. <br />Niles, MI 49120 <br />Quotation was submitted by James Boyles <br />QUOTATION: $71,167.00 <br />RIETH-RILEY CONSTRUCTION CO. INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Drew D. Snodderly <br />QUOTATION: $101,661.00 <br />HRP CONSTRUCTION CO.. INC. <br />5777 Cleveland Road <br />P. 0. Box 266 <br />South Bend, IN 46624-0266 <br />Quotation was submitted by Matthew D. Cain <br />QUOTATION: $67,218.05 <br />WALSH & KELLY, INC. <br />24368 State Road 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Lynn J. Bauer <br />QUOTATION: $77,160.00 <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik and carried, the above quotations <br />were referred to Engineering for review and recommendation. <br />After reviewing those quotations, Mr. Roger Nawrot, Engineering, recommended that the Board <br />award the contract to the lowest responsive and responsible bidder, HRP Construction Co., Inc., <br />in unit prices not to exceed $67,218.05. Therefore, Mr. Roles made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Maradik <br />seconded the motion, which carried. <br />OPENING AND AWARD OF QUOTATIONS — 2016 CURB AND SIDEWALK <br />CONSTRUCTION. PHASE IIi — PROJECT NO 116-029B (MV H <br />Mr. Odor advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />L.L. GLANS CONSTRUCTION CO. <br />1905 Elder Road <br />Mishawaka, IN 46545 <br />Quotation was submitted by Mark Groshans <br />QUOTATION: $52,500.00 <br />PREMIUM CONCRETE SERVICES INC. <br />712 Richmond St. <br />Elkhart, IN 46516 <br />Quotation was submitted by Becky L. Yeakey <br />QUOTATION: $29,400.00 <br />TX CONCRETE <br />24899 Fillmore Rd. <br />South Bend, IN 46619 <br />Quotation was submitted by Jose Luis Quijada <br />
The URL can be used to link to this page
Your browser does not support the video tag.