Laserfiche WebLink
103 <br />REGULAR MEETING <br />APRIL 1, 1986 <br />LEGAL SERVICES PROGRAM OF NORTHERN INDIANA, INC. <br />LEGAL SERVICES ACTIVITY <br />The targeted goal for this activity is to provide 1,520 persons <br />with legal counseling or referral services. The total cost of <br />this activity shall not exceed $42,000.00. <br />CHILD ABUSE AND NEGLECT COORDINATING ORGANIZATION <br />CANCO NEGLECT PREVENTION ACTIVITY <br />The targeted goal for this activity is to provide crisis <br />intervention counseling to 58 families within the Community <br />Development Neighborhood Revitalization Area. The total cost of <br />this activity shall not exceed $23,360.00. <br />Upon a motion made by Mr. Leszczynski, seconded by Ms. Barnard <br />and carried, the above contracts were approved. <br />AWARD BID AND APPROVE CONSTRUCTION CONTRACT - MICHIGAN STREET <br />IMPROVEMENTS PROJECT <br />In a letter to the Board, Mr. Neil A. Shanahan, Manager, Bureau <br />of Public Construction recommended that the Board award the low <br />bid of Ziolkowski Construction, Inc., 1005 South Lafayette, Box <br />1106, South Bend, Indiana, in the amount of $845,615.50 which <br />includes Alternate No. 1 for the above referred to project. <br />Mr. Leszczynski advised that bids for the above referred to <br />project were opened by the Board on March 25, 1986. Mr. <br />Leszczynski further advised that in accordance with the award of <br />this bid, a Contract in said amount was being submitted for Board <br />approval. Upon a motion made by Ms. Barnard, seconded by Mr. <br />Leszczynski and carried, the above bid was awarded and the <br />Contract approved, subject to the filing of the appropriate <br />insurance, Performance Bond and Labor and Materials Payment <br />Bond. <br />AWARD BID _- ONE (1) 10,500 GVWR REPLACEMENT CAB AND CHASSIS FOR <br />SOUTH BEND FIRE DEPARTMENT AMBULANCE <br />In a letter to the Board, Fire Chief Luther Taylor recommended <br />that the bid of Tom Wood Pontiac-GMC, Inc., 7550 East Washington <br />Street, Indianapolis, Indiana, in the amount of $15,690.00 be <br />awarded for one (1) 10,500 GVWR replacement cab and chassis for a <br />South Bend Fire Department ambulance. Assistant Chief Dan <br />Mirocha was present and advised the Board that Tom Wood <br />Pontiac-GMC met the specifications more closely than the only <br />other bidder, Gates Chevrolet, in three important areas. Gates <br />Chevrolet bid an alternator with 105 AMP's which is too small to <br />-- meet and supply the electrical needs of their ambulance. They <br />cannot furnish bucket seats. The bench seats, as proposed, make <br />it impractical and almost impossible to mount the radio system, <br />and all the emergency lighting and siren switches. Also, the <br />throttle is a manual adjustable pull type instead of the electric <br />throttle specified. Mr. Leszczynski advised that bids for the <br />above referred to project were opened by the Board on February <br />11, 1986. Upon a motion made by Ms. Barnard, seconded by Mr. <br />Vance and carried, the recommendation was accepted and the bid <br />awarded. <br />AWARD BID - APPROXIMATELY EIGHT (8) NEW OR USED VEHICLES FOR THE <br />1986 SOUTH BEND POLICE DEPARTMENT DETECTIVE BUREAU FLEET <br />In a letter to the Board, Police Chief Charles T. Hurley advised <br />that after careful study of the bids for the above referred to <br />vehicles, it is the recommendation of the Police Department that <br />the bid be awarded to The Hertz Corporation, 2400 East Devon, <br />Suite 380, Des Plaines, Illinois 60018. <br />The Hertz Corporation bid specified 1985 Ford LTD 4-door sedans <br />and met all bid specifications except for the specification <br />