My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/88 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1988
>
10/17/88 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:26:46 PM
Creation date
9/29/2016 11:36:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/17/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12: <br />REGULAR MEETING <br />OCTOBER 17, 1988 <br />North 44°34'49" East, 22.00 feet; thence North <br />45025'11" West, 75.77 feet; thence South 89°34'49" <br />West, 17.37 feet; thence South 00'25'11" East, 22.00 <br />feet to the Point of Beginning of this Description; <br />the bottom plane of the vertical space contained <br />herein shall be elevation 720.33 feet (USGS Datum); <br />and the top plane of the vertical space herein shall <br />be elevation 746.00 feet. <br />2. The South Bend Redevelopment Commission and South Bend <br />Board of Public Works hereby authorize their respective officers <br />to execute any and all documents, including but not limited to <br />deeds and other evidences of this conveyance, to carry out the <br />intent of this joint resolution. <br />Adopted by the South Bend Redevelopment Commission this <br />14th day of October, 1988. <br />SOUTH BEND REDEVELOPMENT <br />COMMISSION <br />s/Paula N. Auburn, Vice President <br />ATTEST: <br />s/Roman Piasecki, Secretary <br />Adopted by the South Bend Board of Public Works this 17th <br />day of October, 1988. <br />ATTEST: <br />s/Sandra M. Parmerlee, Clerk <br />Board of Public Works <br />SOUTH BEND BOARD OF PUBLIC WORKS <br />s/John E. Leszczynski, President <br />s/Katherine Humphreys <br />s/Patricia E. DeClercq <br />EXHIBIT I <br />Rendering of Century Center <br />(RENDERING) <br />(1) Convention Center -Upper Level: Banquet seating <br />capability 1,500 and conventions 1,500-2,000 <br />persons. Lower Level: Nine conference rooms. <br />(2) Discovery Hall -Educational, technical and historical <br />displays including Studebaker Collection of Historic <br />Vehicles and displays highlighting achievements of <br />Associates, Bendix and Oliver companies. <br />(3) Community Place -Main lobby area. <br />(4) Performing Arts-600 seat theater and 150 seat film <br />projection room. <br />(5) Art, Education and Recreation Center -exhibit space, <br />classrooms, studios, library, etc. <br />APPROVE AGREEMENT COVERING CONSTRUCTION OF HIGHWAY -RAILWAY GRADE <br />CROSSING - 1400 SOUTH OLIVE STREET AT NORFOLK AND WESTERN <br />Mr. Leszczynski stated that the above referred to Agreement is <br />for installation of a rubber pad crossing surface on tracks #88 <br />and #77 at 1400 South Olive Street at the Norfolk and Western <br />Railroad crossing and to remove track #48 and repair slot. The <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.