My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/09/89 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1989
>
10/09/89 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:26:15 PM
Creation date
9/28/2016 10:59:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/9/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
302 <br />REGULAR MEETING <br />OCTOBER 9, 1989 <br />The regular meeting of the Board of Public Works was convened at <br />9:38 a.m. on Monday, October 9, 1989, by Board President John E. <br />Leszczynski, with Mr. Leszczynski, Mrs. Patricia E. DeClercq and <br />Ms. Katherine Humphreys present. Also present was Assistant City <br />Attorney Jenny Pitts Manier. <br />AGENDA ITEMS ADDED <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. DeClercq <br />and carried, a Traffic Control Device and Claims were added to <br />the agenda. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mrs. DeClercq, seconded by Ms. Humphreys <br />and carried, the minutes of the regular meeting of the Board held <br />on October 2, 1989, were approved. <br />OPENING OF BIDS - ST. JOSEPH/WAYNE STREET PARKING GARAGE - <br />PEDESTRIAN WALKWAY <br />Mr. Leszczynski advised that this was the date set for receiving <br />and opening of sealed bids for the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South <br />Bend Tribune and the Tri-County News which were found to be <br />sufficient. <br />The following bids were opened and publicly read: <br />KASER-SPRAKER CONSTRUCTION INC. <br />25487 W. State Road 2 <br />P.O. Box 3605 <br />South Bend, Indiana 46619 <br />Bid was signed by Gary L. Spraker, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: $165,200.00 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Ben Ziolkowski, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: $198,235.00 <br />The unit cost of unused miscellaneous placed mild <br />steel returned to Owner: Two hundred dollars <br />($200.00) per ton. <br />MURDOCK & SONS CONSTRUCTION INC. <br />1320 South Franklin Street <br />South Bend, Indiana 46618 <br />Bid was signed by W.H. Calvin Murdock, President, Non - <br />Collusion Affidavit was in order and a 5% Bid Bond was <br />submitted. <br />BID: $163,000.00 <br />The unit cost of unused miscellaneous placed mild <br />steel returned to Owner: N/A <br />Voluntary Alternate: To use insulated glass and <br />thermal break system - Deduct $4,000.00 <br />I- <br />I <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.