My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/89 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1989
>
04/03/89 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:30:24 PM
Creation date
9/27/2016 2:43:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/3/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Valp <br />CC rp <br />REGULAR MEETING <br />APRIL 3, 1989 <br />The regular meeting of the Board of Public Works was convened at <br />9:33 a.m. on Monday, April 3, 1989, by Board President John E. <br />Leszczynski, with Mr. Leszczynski, Mrs. Patricia E. DeClercq and <br />Ms. Katherine Humphreys present. Also present was Assistant <br />City Attorney Marva Leonard -Dent. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mrs. DeClercq, seconded by Ms. Humphreys <br />and carried, the minutes of the regular meeting of the Board held <br />on March 27, 1989 were approved. <br />OPENING OF BIDS - 27TH STREET LIFT STATION AT NORTHSIDE BOULEVARD <br />AND FILING OF APPLICATIONS FOR BIDDER QUALIFICATION <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly read: <br />H. DE WULF, INC. <br />58600 Executive Drive <br />Mishawaka, Indiana 46544 <br />Bid was signed by Henry DeWulf, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: Lift Station Manufactured by Smith & Loveless, Inc. <br />Total Base Bid: $150,000.00 <br />Additive Alternate <br />A-1 Generator Set, Trailer Mounted $ 25,000.00 <br />Total Amount of Bid with Alternate A-1 $175,000.00 <br />HRP COMPANY, INC. <br />P.O. Box 266 <br />South Bend, Indiana 46624-0266 <br />Bid was signed by Paul J. Fallon, General Manager, Non - <br />Collusion Affidavit was in order and a 5% Bid Bond was <br />submitted. <br />BID: Lift Station Manufactured by Smith & Loveless, Inc. <br />Total Base Bid: $107,003.00 <br />Additive Alternate <br />A-1 Generator Set, Trailer Mounted $ 15,800.00 <br />Add for Consolidated Controller $ 1,960.00 <br />KASER-SPRAKER CONSTRUCTION, INC. <br />25487 W. State Road 2 <br />P.O. Box 3605 <br />South Bend, Indiana 46619 <br />Bid was signed by Gary L. Spraker, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: Lift Station Manufactured by Smith & Loveless, Inc. <br />Total Base Bid: $ 98,385.00 <br />Additive Alternate <br />A-1 Generator Set, Trailer Mounted $ 16,650.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.