<br />REGULAR MEETING
<br />OCTOBER 7, 1991
<br />sanitation sewer system of the City of South Bend to provide
<br />sanitary sewer service to two (2) parcels of property described
<br />in the document, Paul L. Martin and Ronny L. Shrum, owners of
<br />real estate, waive and relase any and all rights which they may
<br />now or hereafter have to remonstrate against or otherwise object
<br />or oppose any pending or future annexation by the City of the
<br />real estate described. Mrs. DeClercq made a motion that this
<br />document be accepted and approved. Ms. Humphreys seconded the
<br />motion which carried.
<br />APPROVE INDIANA DEPARTMENT OF TRANSPORTATION REPORT OF CONTRACT
<br />FINAL INSPECTION AND RECOMMENDATION FOR ACCEPTANCE
<br />Mr. Leszczynski advised that the Engineering Department has
<br />submitted to the Board the above referred to document in
<br />conjunction with the intersection signalization project which
<br />took place at the intersections of Miami and Calvert, Twyckenham
<br />and Calvert, Miracle Lane and Hickory and Mishawaka Avenue and
<br />Logan. Mr. Leszczynski made a motion that this final inspection
<br />report be accepted and approved. Ms. Humphreys seconded the
<br />motion which carried.
<br />APPROVE WASTEWATER DISCHARGE PERMITS
<br />Ms. Megan Wright, Pretreatment Coordinator, Division of
<br />Environmental Services, recommended and requested that the
<br />Industrial Discharge Permits for Heat Treat, Inc., 1331 Northside
<br />Boulevard, South Bend, Indiana, Nimet Industries, 2424 North
<br />Foundation Drive, South Bend, Indiana and Van Dyne Crotty, 2810
<br />Foundation Drive, South Bend, Indiana be approved. Ms. Wright
<br />noted that Heat Treat and Nimet are existing permits which are
<br />being renewed. Van Dyne Crotty is a new industrial laundry.
<br />Therefore, Mr. Leszczynski made a motion that the Wastewater
<br />Discharge Permits be approved. Ms. Humphreys seconded the motion
<br />which carried.
<br />AWARD BID - STUDEBAKER CORRIDOR RESIDENTIAL ASBESTOS ABATEMENT
<br />PHASE II
<br />In a Memorandum to the Board, Mr. Carl P. Littrell, Director,
<br />Division of Engineering, advised that he has reviewed the bids
<br />received on September 30, 1991 for the above referred to project
<br />and recommends at this time that the Board award the lowest of
<br />seven (7) bids as submitted by Specialty Systems of Illinois,
<br />Inc. South Bend Division, 1408 Elwood Avenue, South Bend,
<br />Indiana, in the amount of $8,964.00 for the above referred to
<br />project. Mr. Littrell noted that Specialty Systems also offers
<br />two million dollars ($2,000,000.00) worth of occurence coverage
<br />asbestos liability insurance without additional premium and they
<br />propose to complete the work in eight (8) days. Mr. Leszczynski
<br />made a motion that this recommendation be accepted and the bid be
<br />awarded. Ms. Humphreys seconded the motion which carried.
<br />AWARD BID - STUDEBAKER CORRIDOR RESIDENTIAL DEMOLITION - PHASE II
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised
<br />the Board that he has reviewed the bids received on September 30,
<br />1991, for the above referred to demolition project and at this
<br />time recommends that the Board award the lowest of the four (4)
<br />bids received as submitted by Warner and Sons, Inc., P.O. Box 87
<br />Elkhart, Indiana, in the amount of $46,999.00. Mr. Littrell also
<br />indicated that Warner and Sons proposes to complete the work in
<br />thirty (30) days. Mrs. DeClercq made a motion that the
<br />recommendation be accepted and the bid be awarded. Mr.
<br />Leszczynski seconded the motion which carried.